Lot 9 Plastering work
The extension of the Rudolf Tarnow School in Boizenburg is the first phase of construction.
The new building is planned as a modern and open, non-basement two-storey building with a flat roof. The building has a trapezoidal floor plan. Half of the 1st floor is designed on inclined round columns cantilevered above the ground floor. This results in a walk-in schoolyard area. The 1st floor with its external dimensions of approx. 72 x 21.50/10.00m rests on the ground floor of approx. 35.32 x 16.50/10.00m and 46 round columns.
The new 2-storey building complements the existing 4-storey building with a gross floor area of
approx. 1,657m2 with 8 classrooms, a specialist room and a canteen on the ground floor. In addition,
the "elevation" of the 1st floor, a protected schoolyard of approx. 741m2 was created.
- Scaffolding staircase 72 m3
- Interior plaster lime cement plaster, single layer 385 m2