The Droste-Hülshoff-Gymnasium in Rottweil is to be expanded.
The new building is planned as a two-storey building (ground floor and upper floor) with partial basement in reinforced concrete construction (BRI approx. 10,900m³).
The following measures are planned:
ca. 1.100 m C-Stahl Rohr DN 15 - DN 40
approx. 10,600 m system pipe for underfloor heating
approx. 10 pieces of heating circuit manifold
1 air-to-water heat pump as a set of 3
2 Air-to-water heat pump as a single heat pump
The following measures are planned:
ca. 1.100 m C-Stahl Rohr DN 15 - DN 40
approx. 10,600 m system pipe for underfloor heating
approx. 10 pieces of heating circuit manifold
1 air-to-water heat pump as a set of 3
2 Air-to-water heat pump as a single heat pump