FL 24 - Flooring work
The flooring work includes the laying of floors with linoleum or PVC and parquet of houses 1, 2 and 4 including the corresponding general substrate preparations and repairs as well as the laying of wooden baseboards. In some areas, the old linoleum covering must be removed.
In advance, 2 sample rooms (classrooms), one each in house 1 and house 2, are to be created.
4,500 m2 of flooring in Lino or PVC
160 m2 parquet flooring (prefabricated parquet)
Install 2000 m of wooden skirting boards
200 m2 dismantling of existing linoleum incl. sanding of adhesive residues
+++ The following documents must be submitted to the issuing body upon separate request:
Original calculation
Content of the original calculation: This must be prepared according to the content according to form 223 - breakdown of unit prices, i.e.: course item; short description; quantity; unit of measure; time approach; partial costs including additions in euros per unit of measure (wages, substances, equipment, other); offered unit price (wages, substances, total) devices, other) . +++