Earthworks LV 002 for construction phase 1
Start December 2023, completion March 2024
Small demolition work, external staircase etc.
Loosen topsoil, store sideways 1000 cbm
Loosen the soil excavation pit and remove the landfill 4,700 tons
Soil: Loosen the excavation pit and store it laterally 1290 cbm
Soil excavation pit coarse grading 1005 sqm
Earthworks LV 002 for construction phase 1