Electrical systems for new construction with canteen, DESY, CTA Science Data Management Centre
Manufacture, delivery and assembly of:
High voltage including outdoor lighting
Self-contained power supply systems
Security lighting
Low voltage switchgear
House introduction u. Connections NSHV/G HV
Sub-distributions
KNX system
Lighting systems
Security lighting
Lightning protection and grounding systems
Telecommunication systems cables and wires
Search and signalling systems
Time service facilities
Fire alarm system
Passive media technology components.
Commissioning, briefing, acceptance.
Electrical systems for the construction of a science data management centre (SDMC) for the Cherenko Telescope Array (CTA) and a canteen.
The structure, consisting of a flat base building and an office bar arranged above and partly projecting above it.
Two identical upper floors, a ground floor and a partial basement. The office workstations of the CTA SDMC are located on the upper floors, while the meeting room, the canteen with dining room with adjoining rooms (kitchen) and central building services areas (e.g. ventilation center) are located on the ground floor.
The building is accessed via two staircases and a lift.
The gross floor area of all levels is approximately 2,800 m².
The building exterior dimensions are approximately 28.5m x 43.0m for the EC body and approx. 17.5m x 44.5m for the OG body. The storey heights are approximately 4.40m for the ground floor and 3.15m for the 1st and 2nd floors respectively.
Manufacture, delivery and assembly of:
High voltage including outdoor lighting
Self-contained power supply systems
Security lighting
Low voltage switchgear
House introduction u. Connections NSHV/G HV
Sub-distributions
KNX system
Lighting systems
Security lighting
Lightning protection and grounding systems
Telecommunication systems cables and wires
Search and signalling systems
Time service facilities
Fire alarm system
Passive media technology components.
Commissioning, briefing, acceptance