Electrotechnical plant and lighting and NT
Two side elevated platforms and an additional track crossing:
• Delivery, installation and connection of two distribution cabinets
• Connection of two rail lubrication system cabinets
• Delivery, installation and connection of 8 luminaires under the weather protection roof
• Supply of 10 luminaires for installation and connection of the chipped lighting
• Delivery, installation and connection of 2 luminaires for additional track crossing
• Delivery and installation of the cable system (Elt. and lighting) approx. 3500 m
P&R Plant
• Supply of 4 luminaires for mounting and connecting the pole lighting
• Delivery and installation of the cable system (Elt. and lighting) approx. 300 m
Turning loop
• Supply of 7 luminaires for mounting and connecting the pole lighting
• Delivery and installation of the cable system (Elt. and lighting) approx. 250 m
Telecommunications
• Ready-to-use assembly and connection of the new telecommunications technology
Equipment (1 ticket machine, 1 emergency call station, 4 destination displays with the clock, 1
Info display and 2 bus destination indicators)
• Delivery and installation of the cable system FM cable approx. 1300 m and fiber optic cable approx. 200 m
General electrical and NT work
• Performing the functional tests of the circuits and all necessary measurements according to
the VDE regulations
• Testing and creation of measurement reports for the FM and fiber optic cables and
Installation measurement protocols for the distribution cabinets
• Grounding system
• Check the continuity of the cable protection pipes.