Heater.
The new building will be connected to the existing local heating network in the field and will be supplied with heat via an underground steel line DN 65 (approx. 60 m). Total heat demand approx. 275 kW.
The rooms are heated by radiant ceiling panels (approx. 275 hours) and in ancillary rooms by steel pipe radiators (approx. 25 hours) and heating walls (approx. 22 hours).
Main cable made of steel pipe welded up to DN 65 length approx. 250 m.
Ducting system for connection of radiant ceiling panels/radiators in stainless steel up to DN 50, length approx. 4 900 m, including thermal insulation with pipe shells.
Distribution system with 7 control groups, connection for RLT device DN 50. Ancillary work is core drilling (approx. 160 hours to 180 mm), winter construction heating.