Secondary school construction work | Tenderlake

Secondary school construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
14 May 2020
Closing Date:
02 June 2020
Location(s):
DE224 Deggendorf (DE Germany/DEUTSCHLAND)
Description:
Flood remediation with replacement of the St. Gotthard High School in Niederalteich. Product: Acoustic curtains BA2

Building description - construction phase 2:

Several rectangular structures built together, z. T. between or over existing structures

Break hall ground floor:

- L / W approx.21.15 mx 11.78 m, height approx.6.05 m-7.62 m.

Music wing OG:

- L / W approx.9.23 mx 48.12 m, height approx.4.34 m-5.62 m;

- Design: solid construction made of reinforced concrete and wooden stand construction;

- Facades: Insulated with intent;

- Windows: metal or wooden structures;

- Roof construction: carpentry-like wooden purlin roof structure (pent roof) or flat and Glass roofs.

- rails: 67 m;

- 1 run of flat ejector rails;

- curtains 180 m 2nd ;

- Sound absorbing blackout fabric;

- alpha value 0.7-1.00;

- Scarf height approx.2.70 m.

Download full details as .pdf
The Buyer:
Benediktinerabtei St. Mauritius Niederaltaich
CPV Code(s):
39515000 - Curtains, drapes, valances and textile blinds
45210000 - Building construction work
45214220 - Secondary school construction work