Development of design and cost estimation documentation for the construction of a medium pressure gas pipeline with PE with a diameter of 180/90mm and a length of L-1500.0/520.0 m respectively and two medium pressure gas connections with PE with a diameter of dn63/32mm and a length of L-150.0/15.0 m respectively, together with a reduction and measurement unit with a capacity of up to 160 m3/h and a reduction and measurement point with a capacity of up to 25m3/h in accordance with the conditions of connection to the gas network and technical conditions in msc. Pszczela 10, Dz. nr 13-43/66 and dz. nr 13-43/75, 13-43/22 along with obtaining a map for design purposes. UP/00457714
Material scope:
• Medium pressure gas pipeline with PE dn 180/90mm and length L-1500.0/520.0m respectively
• Medium pressure gas connections with PE dn 63/32mm and length L- 150.0/15.0m respectively – pcs. 2
• Reduction and measurement gas assembly with throughput Q=160m3/h — pcs. 1
• Gas reduction and measurement point with a throughput Q=25m3/h – pcs. 1
Development of design and cost estimation documentation for the construction of a medium pressure gas pipeline with PE with a diameter of 180/90mm and a length of L-1500.0/520.0 m respectively and two medium pressure gas connections with PE with a diameter of dn63/32mm and a length of L-150.0/15.0 m respectively, together with a reduction and measurement unit with a capacity of up to 160 m3/h and a reduction and measurement point with a capacity of up to 25m3/h in accordance with the conditions of connection to the gas network and technical conditions in msc. Pszczela 10, Dz. nr 13-43/66 and dz. nr 13-43/75, 13-43/22 along with obtaining a map for design purposes. UP/00457714
Material scope:
• Medium pressure gas pipeline with PE dn 180/90mm and length L-1500.0/520.0m respectively
• Medium pressure gas connections with PE dn 63/32mm and length L- 150.0/15.0m respectively – pcs. 2
• Reduction and measurement gas assembly with throughput Q=160m3/h — pcs. 1
• Gas reduction and measurement point with a throughput Q=25m3/h – pcs. 1
A detailed description of the subject matter of the contract shall be included in the template of the contract annexed to the SWZ and in the annexes thereto.