Cleaning of drainage systems in the area of the Masters Ratingen and the Autobahnmeisterei Duisburg.
47-20-7033
- approx. 80 gas tests;
- approx. 32 pieces removal of dangerous concentration;
- approx. 35 shut-off valves;
- Carry out approx. 19 St. declaration analysis;
- Approx. 188 pieces of high-pressure flushing and suction car;
- Approx. 19 night use of high-pressure flushing and suction car;
- approx. 75 pieces removal of roots in drainage pipes;
- approx. 18 hours removal of roots in drainage pipes at night;
- Approx. 2300 m camera inspection of drainage pipelines;
- Approx. 700 m camera inspection of drainage pipelines at night;
- approx. 491 t. Dispose of waste;
- approx. 48 m
- approx. 4 psch. Set up construction site;
- keep around 0.8 Mt.
- approx. 4 psch. Clear site equipment;
- approx. 4 psch. Set up inlet and outlet block;
- approx. 4 psch. Manufacture water drainage system at the choice of the contractor;
- Take approx. 4 water samples above the water * Tapping device;
- approx. 8 samples to AG * bottle of the contractor;
- take approx. 8 samples of sludge / deposit * sampling device;
- approx. 4 psch. High-pressure flushing and suction car use
- approx. 4 psch. Clean the rainwater retention basin
- approx. 760 m