Renovation of student dormitory Gerokstraße 38, 01307 Dresden, Germany / Lot 500: Outdoor facilities
Lot 500 Outdoor facilities:
Dismantling and demolition: ~490m² concrete slabs, ~75m asphalt separation, ~435m² asphalt pavement, ~115m concrete curb, ~105m 1-row, ~320m² protective asphalt; Drainage: ~65m plastic pipe, ~1 street inlet, ~9pcs drainage channels underneath. Lengths; Civil engineering for electrical: ~12 sleeve foundations, ~180m pipeline trench; Steps and concrete elements: ~7 concrete block steps, ~60m concrete block elements 800x300mm, ~55m concrete seating elements, partly with lighting; Coverings: ~60m² waterborne Path surface, ~20m² gravel terrace, ~490m² concrete slab pavement 60x40x10, ~390m² concrete pavement 16x24x8, ~105m² lawn honeycomb, ~45m² small pavement, ~330m curb edging, ~185m steel strip, ~265m rower, ~93m² synthetic pavement, ~65m² granite large stone pavement, ~55m² asphalt; Equipment: ~19pcs Gratings underneath Dimensions, enclosure of garbage yard and NEA site, ~12pcs bollards as custom-made, ~. 6 traffic signs, ~72pcs bicycle racks, ~19m leaning brackets for cargo bikes, ~9pcs steel bollards, ~1pcs ash box, ~2pcs loungers, ~2pcs table tennis table, ~21 seat pads;
Vegetation: ~915m² lawn, ~500m² planting, ~15 tall trunks or solitaires,
Completion and development maintenance