Elevator systems
* Dates for performing the main service on the construction site:
Start of service 09.01.2023; Performance end 22.12.2023
* Interim dates:
Delivery of installation parts: 21.02.2022
* Description of the procurement:
1 x passenger lift handicapped accessible, through-loader, payload 1,325 kg, integrated rope drive shaft, delivery height approx. 19.00 m.
1 pcs freight elevator, through-loader, payload 7,000 kg, rope drive machine room above shaft, delivery height approx. 7.00 m