A 3 Nürnberg-Passau, 6-lane expansion from AK Regensburg to AS Rosenhof Noise barriers Gärtnersiedlung.
Scope of services:
Noise protection wall areas: 3 units (BA 1-3 and BA 4 + 5)
Noise protection wall sections: 5 pieces
Single wall lengths: BA 1: 216 m, BA 2: 298 m, BA 3: 228 m, BA 4: 260 m, BA 5: 72 m
Total length: 1 074 m
Execution: BA 1 + 2: highly absorbent on both sides, BA 3, 4 + 5: Highly absorptive on the motorway side / Reflective on the adjoining side
Wall surface noise barriers: BA 1: 2 020 m
Founding: Foundations of steel foundations, bored pile foundations, fixings on torsion beams
Demolition services: dismantling of existing wall (LS wall made of reinforced concrete on individual foundations with absorber elements on the motorway side)
The services essentially include:
- 3 200 m
- 2 100 m
- 9 400 m
- 6 970 m
- 770 m
- 3 370 m
- 1 400 m
- 584 m pile foundations,
- 829 m bored piles,
- 6 pcs. Anchorages on concrete,
- 700 m
- 5 230 m
- 5 260 m
- 3 680 m
- 995 m
- 1 300 m