The marking work includes the application of marking systems (marking materials and co-formulants) including their delivery for the new construction of the B 50 from plates to Longkamp and the B269 towards Traben-Trarbach to the roundabout, and the renewal between AS Altrich and AS plates.
- about 40 000 m KSP 0.15 m,
- about 65 000 m KP 0.15 m,
- about 35 000 m KP 0.30 m,
- about 17 000 m KP 0.12 m.
And further marking work (arrows, slashes, ...) and ancillary works