repair work on communal and intercommunal roads in the department of Lozère
road 2023 phase 3 sector 01 Hautes Terres de l'aubracBituminous concrete: 504 T
Untreated grave: 1,835 T
Road drains : 600 M
Disbursement: 2,072 m2
roads 2023 phase 3 sector 02 Terres d'apcher Margeride AubracBituminous concrete: 593 T
Untreated grave: 1,770 T
Disbursement: 3,185 m2
Manual hot coated: 560 M2
road 2023 phase 3 sector 16 Mont-Lozère and Gouletcold asphalt: 2,800 M2
Serious bitumen: 185 T