23E0046 (LBB Mainz) Universitätsmedizin der Joh. Gutenberg University Mainz - New Building Building 308D HI-TRON / Structural Work I
waterproofing work; Approx. 630 m2 of fresh concrete foil under the floor slab and offshoots, approx. 340 m2 of fresh concrete foil on the outer wall made of WU concrete; Steel construction work: 45262420-1 structural steel assembly work for structures; Approx. 12 tons of structural steel for roof structures, platforms, steel stairs, working platforms in TGA shafts, Approx. 240 m2 of trapezoidal sheet metal roof covering, Approx. 30 pcs of pressed grating steps R10 width 900 mm, Approx. 25 pieces of pressed grating steps R10 width 1400 mm, Approx. 80 m2 of pressed gratings for platform and working platform coverings, Approx. 2 pcs vertical ladders H min. 2.50 m, Approx. 60 m of pipe railings, Approx. 470 m of rod railings; Anti-corrosion work: 45442200-9 Application of anti-corrosion coatings; Approx. 5.5 tons of structural steel hot-dip galvanizing C2, approx. 11 tons of rod railings hot-dip galvanizing C2, approx. 6.5 tons of structural steel hot-dip galvanizing C3, Approx. 2.5 tons of tubular and rod railings hot-dip galvanizing C3; MEP services - Construction work for sewers: 45232400-6 Construction work for sewers; approx. 200 m sewer PP-MD, approx. 100 m sewer PE, approx. 1 pc rainwater lifting system, approx. 3 pcs shaft structures, approx. 18 pcs floor drains, approx. 8 pcs cleaning closures, approx. 23 pcs wall collars, approx. 5 pcs media penetrations, electrical work 44141100-1 Electrical conduits, approx. 480 m Electrical conduit plastic OD 25mm in concrete, approx. 72 pcs Devices Junction box, for in-situ concrete, approx. 325 m Insert feed-through system in formwork wall, approx. 2 pcs feed-through system 2-by-side feedthroughs in formwork, approx. 2 pcs feed-through system 3crossings next to each other in formwork, approx. 2 pcs media feedthroughs; Electrical work 45312310-3 lightning protection work; approx. 340 m grounding ring earth steel stainless steel Rd10, approx. 1680 pcs grounding foundation earth of the Fl30-St, approx. 460 m deduction of Fl30-St wall in reinforcement, approx. 84 pcs grounding fixed point steel niro, approx. 5.5 tons of structural steel hot-dip galvanizing C2, approx. 11 tons of rod railings hot-dip galvanizing C2, approx. 6.5 tons of structural steel hot-dip galvanizing C3, approx. 2.5 tons of tubular and rod railings hot-dip galvanizing C3; MEP services; Construction work for sewers: 45232400-6 Construction work for sewers; approx. 200 m sewer PP-MD, approx. 100 m sewer PE, approx. 1 pc rainwater lifting system, approx. 3 pcs shaft structures, approx. 18 pcs floor drains, approx. 8 pcs cleaning closures, approx. 23 pcs wall collars, approx. 5 pcs media penetrations, electrical work 44141100-1 Electrical conduits, approx. 480 m Electrical conduit plastic OD 25mm in concrete, approx. 72 pcs Devices Junction box, for in-situ concrete, approx. 325 m Insert feed-through system in formwork wall, approx. 2 pcs feed-through system 2Bushings next to each other in formwork, approx. 2 pcs feed-through system 3Feedthroughs next to each other in formwork, approx. 2 pcs media feedthroughs, electrical work 45312310-3 Lightning protection work, approx. 340 m grounding ringworm steel stainless steel Rd10, approx. 1680 pcs Grounding foundation earth Fl30-St, approx. 460 m Abltg Fl30-St Wall in reinforcement, approx. 84 pcs Grounding fixed point steel stainless steel