part of the works allocated to the financial envelope: 7 700 000.00 euro (s) HtThe estimated duration of the works is set at 30 Months.Basic mission within the meaning of Article R.2431-4 of the Public Order Code with:- Execution studies for structures, thermal, fluids, and for V.R.D.; - Examination of conformity and approval of implementation studies for other trades. Studies must include an acoustic design study. In addition, an additional mission will also be entrusted to the holder of the contract and concerning the lots for which the execution studies are not the responsibility of the latter: Provision of detailed quantities on the occasion :-D preliminary design and project studies-consultation of the economic operators in charge of the works-acceptance of the works, taking into account the materials actually "laid"
part of the works allocated to the financial envelope: 7 700 000.00 euro (s) HtThe estimated duration of the works is set at 30 Months.Basic mission within the meaning of Article R.2431-4 of the Public Order Code with:- Execution studies for structures, thermal, fluids, and for V.R.D.; - Examination of conformity and approval of implementation studies for other trades. Studies must include an acoustic design study. In addition, an additional mission will also be entrusted to the holder of the contract and concerning the lots for which the execution studies are not the responsibility of the latter: Provision of detailed quantities on the occasion :-D preliminary design and project studies-consultation of the economic operators in charge of the works-acceptance of the works, taking into account the materials actually "laid"