The service covered by the contract relates to the operation of the works making up the district heating network and comprising a geothermal triplet, two gas cogeneration units, approximately 8.5 km of pipelines and 48 delivery points, 29 of which are equipped with decentralized gas production. .
The service includes:
- the supply of thermal energy (P1) to the various delivery points of the district heating network;
- operation and routine maintenance services (P2) of the thermal production and distribution installations of the urban heating network;
- full guarantee services (P3) for thermal production and distribution installations in the district heating network.
The service covered by the contract relates to the operation of the works making up the district heating network and comprising a geothermal triplet, two gas cogeneration units, approximately 8.5 km of pipelines and 48 delivery points, 29 of which are equipped with decentralized gas production. .
The service includes:
- the supply of thermal energy (P1) to the various delivery points of the district heating network;
- operation and routine maintenance services (P2) of the thermal production and distribution installations of the urban heating network;
- full guarantee services (P3) for thermal production and distribution installations in the district heating network.