Remediation and extension OS Hainsberg - Lot 302 demolition.
Complete demolition of parts of the building, total BRI approx. 1 450 m
- demolition roof truss complete incl. Cover / insulation etc. approx. 610 m
- Demolishing basement floor completely approx. 430 m
- demolished floor-to-ceiling beamed ceiling including floor coverings, formwork and fill approx. 1 000 m
- pollutant disposal according to regulations,
- gutting building demolition of wooden doors about 65 pieces and wooden / plastic windows about 95 pieces,
- Disassembly and disposal of heating cables approx. 800 m,
- disassembly and disposal of panel and cast iron radiators approx. 140 pieces,
- Dismantling and disposal of drinking and waste water pipes approx. 625 m,
- Disassembly and disposal of sanitary items such as washbasins, toilets, urinals etc. about 90 pieces,
- Disassembly and disposal of electrical cables incl. Installation equipment 9 500 m.