The subject of the Order is:
1. Construction of high performance heating connections in the technology of pre-insulated pipes conti with pulse alarm system for buildings:
a) 16 Kozielska Street with a length of about 105 meters, inclusion in the pre-insulated heating network 88.9/160,
b) 10 Skarbowa Street with a length of about 150 meters, inclusion in the pre-insulated heating network 88.9/160.
Situational plans with the route of connections are presented in Annexes 1 and 2 to the SWZ.
2. Connections will be made in accordance with Article 29a point 1 of the Construction Law.
Task No. 1 Construction of the connection to the facility at 16 Kozielska Street (Aldi)1. Construction of high performance heating connections in the technology of pre-insulated pipes conti with pulse alarm system for buildings:
a) 16 Kozielska Street with a length of about 105 meters, inclusion in the pre-insulated heating network 88.9/160,
b) 10 Skarbowa Street with a length of about 150 meters, inclusion in the pre-insulated heating network 88.9/160.
Situational plans with the route of connections are presented in Annexes 1 and 2 to the SWZ.
2. Connections will be made in accordance with Article 29a point 1 of the Construction Law.
Task No. 2 Construction of a connection to the facility at 10 Skarbowa Street (MOK)1. Construction of high performance heating connections in the technology of pre-insulated pipes conti with pulse alarm system for buildings:
a) 16 Kozielska Street with a length of about 105 meters, inclusion in the pre-insulated heating network 88.9/160,
b) 10 Skarbowa Street with a length of about 150 meters, inclusion in the pre-insulated heating network 88.9/160.
Situational plans with the route of connections are presented in Annexes 1 and 2 to the SWZ.
2. Connections will be made in accordance with Article 29a point 1 of the Construction Law.