The subject of the contract is the execution of construction works related to the modernization of the Municipal Stadium at Kolejowa Street in Prudnik - stage one - 1A. The investment is implemented as part of the Government Programme Polish Governance Fund: Strategic Investment Programme based on Resolution of the Council of Ministers No. 84/2021 of 1 July 2021 covered by the preliminary promise of Bank Gospodarstwa Krajowego in Warsaw regarding co-financing of the investment No. Edit2/2021/4016/PolskiLad. Scope of construction works STAGE 1A: 0) Preparatory works – demolition works and felling for the scope indicated in the documentation 1) Construction of a football pitch with a natural grass surface with lighting 2) Construction of a category V athletics arena consisting of: 3) Construction of stands a) Main roofed entrance to the stadium in front of the front with seats for guests b) For special guests, adapted for the disabled with a separate, glazed place for the commentator c) Unroofed for about 200 people 4) Construction of the toilet building 5) Implementation of the necessary development of the area around the stadium 6) Purchase of equipment - sports equipment and for servicing the stadium turf 7) Reconstruction of land development along with the construction of communication routes, installation of small architecture, lighting, drainage and monitoring 8) Power and low-voltage installations 9) External sanitary installation a) Storm water drainage b) External water supply system c) Installation of external sanitary sewage system 10) Internal sanitary installations.
The subject of the contract is the execution of construction works related to the modernization of the Municipal Stadium at Kolejowa Street in Prudnik - stage one - 1A. Scope of construction works STAGE 1A: 0) Preparatory works - demolition and felling works for the scope indicated in the documentation 1) Construction of a football pitch with a natural grass surface with lighting 2) Construction of an athletics arena category V consisting of: a) Circular 6-track track b) 6-lane straight track c) Javelin throw viewport d) Discus and hammer throw viewport e) Shot put viewport f) Pole vault (unidirectional) g) Hill to long jump and triple jump two-track and two-way h) High jump hill 3) Construction of stands a) Main roofed entrance to the stadium with seats for guests b) For special guests, adapted for the disabled with a separate, glazed place for the commentator c) Unroofed for about 200 people 4) Construction of the toilet building 5) Execution of the necessary development of the area around the stadium a) Execution of acoustic screens along the eastern border of the development and on the crown of the stadium in accordance with the guidelines of the environmental decision b) Reconstruction and extension of the surrounding the stadium in order to achieve the required elevation exceeding the flood level in accordance with the guidelines of the water permit c) Construction of a wall separating the unroofed tribune from the economic zone designed in the second stage. d) Construction of pedestrian walks running along the crown of the stadium and leading to the building toilets e) Construction of terrain stairs with handrails leading to the crown of the stadium f) Construction of a fence h=220 cm surrounding the grandstand g) Construction of a fence h=180 cm surrounding the stadium h) Construction of a fence h=120 cm separating the area of a mass event 6) Purchase of facility equipment - sports equipment and for servicing the stadium turf 7) Reconstruction of land development along with the construction of strings communication, installation of small architecture, lighting, drainage and monitoring 8) Power and low-voltage installations a) Roofed tribune lighting b) VIP Tribune - full electrical equipment c) Toilets – full electrical equipment d) Lighting masts for the main pitch with full equipment and power supply e) Lighting of the area 6m poles with equipment and power supply f) Lighting of the area 5m poles with equipment and power supply g) Monitoring for the event area h) Cable teletechnical ducts i) Cable pipeline j) Installation of sound system at the stadium 9) External sanitary installation a) Storm water drainage - reconstruction of the existing storm water drainage system – section D93-D100 - construction of rainwater sewage system related to the main pitch - construction of a rainwater drainage system draining the roofed grandstand, VIP tribune and toilet building - construction of rainwater drainage associated with the southern parking lot - drilling under the embankment - outlet - tank retention - rainwater pumping station - coalescing separator integrated with the settling tank - drainage of the main pitch b) External water supply system - water supply connection no. 2 to toilets, section from W81 to the W82 water meter well - 11.6 m long, section from the W82 water meter well - 649.8 m long - sprinklers on the main pitch c) Installation of external sanitary sewage system - sanitary sewage connection from KS1 to well KS2 - 17.4 m long - external installation from pressure connections no. 1 (from pumping station P1 to expansion chamber KR1) - external installation from connection no. 1 gravity (for inclusion of sanitary building no. 2 to pumping station P1) section from pumping station P1 - length 44.2m - pumping station 10) Internal sanitary installations: a) Internal water supply system – full equipment of the toilet building b) Installation of sanitary sewage system (internal) – full equipment of the toilet building c) Installation of mechanical ventilation – full equipment of the building toilet building d) Installation of air conditioning.