NEW CONSTRUCTION OF A SCHOOL BUILDING THROUGH MODULAR CONSTRUCTION SYSTEM
This assignment includes:
- The study of technical equipment based on the data of the assignment documents (performance specifications).
- Realization based on the order documents and the quotation.
- The execution of the contracting works as a result commitment for a building that should be operated in accordance with current regulations including the conditions of the environmental permit and other administrative permits, but limited to a ready building, fixed furniture but without loose equipment.
This contract contains a conditional part within the meaning of Article 57 of the Law of 17 June 2016 public procurement, namely the foundation slab for the school building of plot 2.
This assignment includes:
- The study of technical equipment based on the data of the assignment documents (performance specifications).
- Realization based on the order documents and the quotation.
- The execution of the contracting works as a result commitment for a building that should be operated in accordance with current regulations including the conditions of the environmental permit and other administrative permits, but limited to a ready building, fixed furniture but without loose equipment.
This contract contains a conditional part within the meaning of Article 57 of the Law of 17 June 2016 public procurement, namely the foundation slab for the school building of plot 2.