Industrial machinery

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
07 April 2023
Closing Date:
30 May 2023
Location(s):
CH0 SCHWEIZ/SUISSE/SVIZZERA (CH Switzerland/SCHWEIZ/SUISSE/SVIZZERA)
Description:
water-cooled grate furnace line 1, incl. recooling

In the course of the plant optimisation and performance improvement project, GEVAG's output is to be increased by 20%

be increased.

For this purpose, among other things, due to the thermal load on the grate of the incineration line 1 by

a water-cooled combustion grate can be replaced. Due to the spatial conditions, the

Heat exchanger for heat dissipation from the cooling circuit for primary air preheating outside the

building, placed on the garbage bunker. The intake of the primary air takes place on the one hand from the

Garbage bunker and on the other hand from the oven house. In addition, a redundant air-water

Recooler installed on the roof of the furnace house.

The current cooling of the filling shaft is to be integrated into the grate cooling. A sufficient

Cooling of the filling shaft must be ensured by the operator. Components of the

As far as possible, filling shaft cooling should be taken over and integrated into the grate cooling.

In the course of the plant optimisation and performance improvement project, GEVAG's output is to be increased by 20%

be increased.

For this purpose, among other things, due to the thermal load on the grate of the incineration line 1 by

a water-cooled combustion grate can be replaced. Due to the spatial conditions, the

Heat exchanger for heat dissipation from the cooling circuit for primary air preheating outside the

building, placed on the garbage bunker. The intake of the primary air takes place on the one hand from the

Garbage bunker and on the other hand from the oven house. In addition, a redundant air-water

Recooler installed on the roof of the furnace house.

The current cooling of the filling shaft is to be integrated into the grate cooling. A sufficient

Cooling of the filling shaft must be ensured by the operator. Components of the

As far as possible, filling shaft cooling should be taken over and integrated into the grate cooling.

Download full details as .pdf
The Buyer:
Nutec Engineering AG
CPV Code(s):
42000000 - Industrial machinery
42162000 - Steam-generating boilers
42163000 - Steam generators
42320000 - Waste incinerators