In the course of the plant optimisation and performance improvement project, GEVAG's output is to be increased by 20%
be increased.
For this purpose, among other things, due to the thermal load on the grate of the incineration line 1 by
a water-cooled combustion grate can be replaced. Due to the spatial conditions, the
Heat exchanger for heat dissipation from the cooling circuit for primary air preheating outside the
building, placed on the garbage bunker. The intake of the primary air takes place on the one hand from the
Garbage bunker and on the other hand from the oven house. In addition, a redundant air-water
Recooler installed on the roof of the furnace house.
The current cooling of the filling shaft is to be integrated into the grate cooling. A sufficient
Cooling of the filling shaft must be ensured by the operator. Components of the
As far as possible, filling shaft cooling should be taken over and integrated into the grate cooling.
In the course of the plant optimisation and performance improvement project, GEVAG's output is to be increased by 20%
be increased.
For this purpose, among other things, due to the thermal load on the grate of the incineration line 1 by
a water-cooled combustion grate can be replaced. Due to the spatial conditions, the
Heat exchanger for heat dissipation from the cooling circuit for primary air preheating outside the
building, placed on the garbage bunker. The intake of the primary air takes place on the one hand from the
Garbage bunker and on the other hand from the oven house. In addition, a redundant air-water
Recooler installed on the roof of the furnace house.
The current cooling of the filling shaft is to be integrated into the grate cooling. A sufficient
Cooling of the filling shaft must be ensured by the operator. Components of the
As far as possible, filling shaft cooling should be taken over and integrated into the grate cooling.