supply and transmission of electricity guaranteeing continuous supply and without any alteration of the needs of the delivery points of the municipality of Pontet.This supply is understood as a “Single Contract” including access to and use of the public distribution network managed by the GDs and including the function of responsible for balance. split into 2 lots ፦lot 1: Bt less than 36 kva (buildings and street lighting) -lot 2: Bt greater than 36 kva and htaDuration: 36 months from the start date of supply set on January 1, 2019 at 00:00:00 and will end on 31 December 2021 at 23h59min59.A variant of extra cost 100% green energy (Enr) may be offered optional
bt less than 36 kva (buildings and public lighting)Number of Pdl: 98 for Site Type: Bt<36 kva - ep; Annual consumption volume: 2,655.179 mWhNumber of Pdl: 49 for Site Type: Bt<36 kva - bat; Annual consumption volume: 569.229 mWhTotal annual consumption volume: 3,224,408 Mwh
bt greater than 36 kva and HtaNumber of Pdl: 7 for Site Type: Bt>36 kva; Annual consumption volume: 621,703 MwhNumber of Pdl: 5 for Site Type: Hta; Annual consumption volume: 1,248,735 MwhTotal annual consumption volume: 1,870.438 Mwh