Technical planning - technical equipment
for the four sub-measures of the individual measure: here I, K and Ka
At the naval base Eckernförde, both new construction and renovation measures of the technical area are planned. The technical area measure shall comprise the following specific measures:
1. Construction phase "New building"
-Sub-measure B - Renovation of building 58 (including demolition of building 63) and extension of boat halls and workshop (approved costs 10,070,360.85 €) separate tender, not part of this tender
-Sub-measure D - New construction of protective roofs and storage areas SEK-M (today KSM)
(Approved costs 3,890,430.63 €) separate tender, not part of this tender
-Sub-measure E+F - New construction of protective roofs and storage areas MSK, Other grannys, KranTrp warehouse and container storage areas Separate tender, not part of this tender
(Approved costs €5,436,870.84)
-Sub-measure I - New construction of equipment for vehicle and equipment washing (approved costs 2,017,634.54 €)
-Sub-measure K + Ka - New parachute drying tower and parachute test group
(Approved costs 4,913,438.69 € parachute drying tower / Costs submitted for approval of ES-Bau Parachute test group 10,451,000.00)
2.Construction phase "Renovation"
-Sub-measure O - Renovation of building 65 (approved costs € 3,156,458.63) Separate tender, not part of this tender
The planned measure is a large construction project (GNUE) of the BMVg. Ew-Bau is approved. There is an execution order from 08.02.2021 according to RBBau section E4 in which the total amount of the approved costs in the amount of 29,486,000 € is shown (without the share of the measure Ka – test group).
The ES-Bau for the measure Ka – Parachute Test Group was submitted for approval with a cost of 10,451,000 €. Due to the technical connections, this measure has been included in the measure of the technical area, specifically to the measure K – parachute drying tower.
The contracting authority intends to award the following planning services for the technical equipment in accordance with the draft contract.
Fee Zones and Eligible Costs:
Teilmaßnahme I: Honorarzone II, KG 400 approx. 690.000 € net
Sub-measure K: Fee zone II, KG 400 approx. € 1,000,000 net
Sub-measure Ka: Fee zone II, KG 400 approx. 2,500,000€ net
A detailed service description as well as other procedure-related procurement documents are posted on the e-procurement platform for the procedure under https://www.meinauftrag.rib.de/public/DetailsByPlatformIdAndTenderId/platformId/7/tenderId/121003739.