Scaffolding structures | Tenderlake

Scaffolding structures

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
03 March 2023
Closing Date:
04 April 2023
Location(s):
DEA51 Bochum, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
Scaffolding as a stage design

Planning, erection and dismantling of a walk-in scaffolding construction with three floors, two two-storey self-supporting bridges and 6 stair towers, including all access stairs to reach the public levels, for rent.

The construction serves as a stage set and auditorium for a music theatre production.

Scaffolding must be self-supporting and self-stable. Parapets, railings on all floors and staircases and staircases must be designed in accordance with the applicable standards, fall and child proof.

- 1 piece scaffolding construction with external dimensions of length 96 m, width 21 m, height 7.2 m overall. Incl. 2 two-storey, self-supporting bridge elements Length 9.5 m, height 3.85 m

- 6 two-storey stair towers to reach the three spectator levels +3.5 m and +6.0 m

- 7 pcs. 3-step stair platforms to reach the spectator level +0.5 m

- 2 pieces of 2-step stair platforms to reach the spectator level +0.3 m

Download full details as .pdf
The Buyer:
Kultur Ruhr GmbH
CPV Code(s):
44212310 - Scaffolding
44212317 - Scaffolding structures
45262100 - Scaffolding work