Natural gas | Tenderlake

Natural gas

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
09 June 2023
Closing Date:
07 July 2023
Location(s):
DEF SCHLESWIG-HOLSTEIN (DE Germany/DEUTSCHLAND)
Description:
Natural gas for various collection points of public administration bodies, mostly in the federal state of Schleswig-Holstein

The pure service for the procurement of energy and handling is put out to tender.

The collection points of the participants were divided into 10 regional lots by the tendering body:

...

Lot 1 Regionallos Nordfriesland (NF)

Los 2 Regionallos Kiel (KI)

Lot 3 Regional lot Plön (PLÖ)

Lot 4 Regional lot Ostholstein (OH)

The 5 Regionallos Segeberg (SE)

Los 6 Regionallos Stormarn (OD)

Lot 7 Regional lot Duchy of Lauenburg (RZ)

Lot 8 Regional lot Pinneberg (PI)

Los 9 Regionallos SH

The 10 Regionallos HEI

...

523 consumption points with a reference consumption of approx. 116.7 GWh.

...

The general authorisation for the exceptions pursuant to Art. 5k para. 2 lit. a to f of the Sanctions Regulation applies here for all 10 lots.

Lot 1 Regionallos Nordfriesland (NF)

Lot 1 Regionallos Nordfriesland (NF)

127 consumption points with a reference consumption of approx. 39.0 GWh.

...

In the case of the consumption points registered for supply by the respective participant, reference quantities checked and approved by the participant must be indicated. The actual consumption in the delivery period may deviate from the determined consumption on the basis of the consumption data in the reference year (= reference quantities) due to usage and weather conditions.

The number of consumables may also vary during the term of the contract. For further details, reference is made to the preliminary remarks on the gas supply contract in the procurement documents.

...

As of October 1, 2021, the previous market areas in Germany, Gaspool (GPL) and NetConnect Germany (NCG), were merged into a new nationwide German gas market called Trading Hub Europe (THE).

As is known in the industry, a conversion from L-gas to H-gas is currently taking place in several network areas. In some cases, this will also begin in 2024 for the acceptance points listed in the call for tenders. Specific changeover dates of the affected acceptance points will be exchanged between the participant and the supplier after appropriate knowledge of the dates.

...

Based on the judgment of the European Court of Justice (ECJ, judgment of 19.12.2018 - C-216/17 - "Antitrust and Coopservice"), the following determination is made: Regardless of the above specifications, the maximum amount of energy that can be obtained p.a. is 200% of the amount of energy specified as the reference quantity (value quantity) p.a. If this value p.a. is exceeded, the framework agreement ends for the respective delivery year.

...

The subject of the tender is the supply of natural gas as a full supply for the properties of public administrations mostly in the state of Schleswig-Holstein.

For the supply of the collection points, a natural gas is required, for which no production specifications are made by the tendering body.

...

Only the pure service for the procurement of energy and handling is put out to tender.

...

The offer prices of this tender are therefore net exclusively for services (handling) to be provided by the bidder to supply the respective acceptance point.

...

In accordance with the provisions in No. 2 of the framework agreement, the fees for energy as well as for grid use, metering point operation, billing, fees in accordance with gas security levy § 26 Energy Security Act, fees gas storage levy § 35e EnWG, fees SLP balancing levy / RLM balancing levy (formerly "standard and balancing energy levy"), fees biogas pass-on amount, allocation market area conversion, concession fee, natural gas tax = Energy tax, CO2 pricing surcharge on the energy taxes of natural gas, and the sales tax in the current amount.

The 10 Regionallos HEI

The 10 Regionallos HEI

66 consumption points with a reference consumption of approx. 11.0 GWh.

...

At the acceptance points registered for supply by the respective participant, reference quantities checked and approved by the participant must be indicated.

The actual consumption in the delivery period may deviate from the determined consumption data in the reference year (= reference quantities) due to use and weather conditions.

The number of consumables may also vary during the term of the contract. For further details, reference is made to the preliminary remarks on the gas supply contract in the procurement documents.

...

As of October 1, 2021, the previous market areas in Germany, Gaspool (GPL) and NetConnect Germany (NCG), were merged into a new nationwide German gas market called Trading Hub Europe (THE).

As is known in the industry, a conversion from L-gas to H-gas is currently taking place in several network areas. In some cases, this will also begin in 2024 for the acceptance points listed in the call for tenders. Specific changeover dates of the affected acceptance points will be exchanged between the participant and the supplier after appropriate knowledge of the dates.

...

Based on the judgment of the European Court of Justice (ECJ, judgment of 19.12.2018 - C-216/17 - "Antitrust and Coopservice"), the following determination is made: Regardless of the above specifications, the maximum amount of energy that can be obtained p.a. is 200% of the amount of energy specified as the reference quantity (value quantity) p.a. If this value p.a. is exceeded, the framework agreement ends for the respective delivery year.

...

The subject of the tender is the supply of natural gas as a full supply for the properties of public administrations mostly in the state of Schleswig-Holstein.

For the supply of the collection points, a natural gas is required, for which no production specifications are made by the tendering body.

...

Only the pure service for the procurement of energy and handling is put out to tender.

...

The offer prices of this tender are therefore net exclusively for services (handling) to be provided by the bidder to supply the respective acceptance point.

...

In accordance with the provisions in No. 2 of the framework agreement, the fees for energy as well as for grid use, metering point operation, billing, fees in accordance with gas security levy § 26 Energy Security Act, fees gas storage levy § 35e EnWG, fees SLP balancing levy / RLM balancing levy (formerly "standard and balancing energy levy"), fees biogas pass-on amount, allocation market area conversion, concession fee, natural gas tax = Energy tax, CO2 pricing surcharge on the energy taxes of natural gas, and the sales tax in the current amount.

Los 2 Regionallos Kiel (KI)

Los 2 Regionallos Kiel (KI)

24 consumption points with a reference consumption of approx. 6.4 GWh.

...

At the acceptance points registered for supply by the respective participant, reference quantities checked and approved by the participant must be indicated.

The actual consumption in the delivery period may deviate from the determined consumption data in the reference year (= reference quantities) due to use and weather conditions.

The number of consumables may also vary during the term of the contract. For further details, reference is made to the preliminary remarks on the gas supply contract in the procurement documents.

...

As of October 1, 2021, the previous market areas in Germany, Gaspool (GPL) and NetConnect Germany (NCG), were merged into a new nationwide German gas market called Trading Hub Europe (THE).

As is known in the industry, a conversion from L-gas to H-gas is currently taking place in several network areas. In some cases, this will also begin in 2024 for the acceptance points listed in the call for tenders. Specific changeover dates of the affected acceptance points will be exchanged between the participant and the supplier after appropriate knowledge of the dates.

...

Based on the judgment of the European Court of Justice (ECJ, judgment of 19.12.2018 - C-216/17 - "Antitrust and Coopservice"), the following determination is made: Regardless of the above specifications, the maximum amount of energy that can be obtained p.a. is 200% of the amount of energy specified as the reference quantity (value quantity) p.a. If this value p.a. is exceeded, the framework agreement ends for the respective delivery year.

...

The subject of the tender is the supply of natural gas as a full supply for the properties of public administrations mostly in the state of Schleswig-Holstein.

For the supply of the collection points, a natural gas is required, for which no production specifications are made by the tendering body.

Only the pure service for the procurement of energy and handling is put out to tender.

The offer prices of this tender are therefore net exclusively for services (handling) to be provided by the bidder to supply the respective acceptance point.

In accordance with the provisions in No. 2 of the framework agreement, the fees for energy as well as for grid use, metering point operation, billing, fees in accordance with gas security levy § 26 Energy Security Act, fees gas storage levy § 35e EnWG, fees SLP balancing levy / RLM balancing levy (formerly "standard and balancing energy levy"), fees biogas pass-on amount, allocation market area conversion, concession fee, natural gas tax = Energy tax, CO2 pricing surcharge on the energy taxes of natural gas, and the sales tax in the current amount.

Lot 3 Regional lot Plön (PLÖ)

Lot 3 Regional lot Plön (PLÖ)

37 collection points with a reference consumption of approx. 2.6 GWh.

...

At the acceptance points registered for supply by the respective participant, reference quantities checked and approved by the participant must be indicated.

The actual consumption in the delivery period may deviate from the determined consumption data in the reference year (= reference quantities) due to use and weather conditions.

The number of consumables may also vary during the term of the contract. For further details, reference is made to the preliminary remarks on the gas supply contract in the procurement documents.

...

As of October 1, 2021, the previous market areas in Germany, Gaspool (GPL) and NetConnect Germany (NCG), were merged into a new nationwide German gas market called Trading Hub Europe (THE).

As is known in the industry, a conversion from L-gas to H-gas is currently taking place in several network areas. In some cases, this will also begin in 2024 for the acceptance points listed in the call for tenders. Specific changeover dates of the affected acceptance points will be exchanged between the participant and the supplier after appropriate knowledge of the dates.

...

Based on the judgment of the European Court of Justice (ECJ, judgment of 19.12.2018 - C-216/17 - "Antitrust and Coopservice"), the following determination is made: Regardless of the above specifications, the maximum amount of energy that can be obtained p.a. is 200% of the amount of energy specified as the reference quantity (value quantity) p.a. If this value p.a. is exceeded, the framework agreement ends for the respective delivery year.

...

The subject of the tender is the supply of natural gas as a full supply for the properties of public administrations mostly in the state of Schleswig-Holstein.

For the supply of the collection points, a natural gas is required, for which no production specifications are made by the tendering body.

...

Only the pure service for the procurement of energy and handling is put out to tender.

...

The offer prices of this tender are therefore net exclusively for services (handling) to be provided by the bidder to supply the respective acceptance point.

...

In accordance with the provisions in No. 2 of the framework agreement, the fees for energy as well as for grid use, metering point operation, billing, fees in accordance with gas security levy § 26 Energy Security Act, fees gas storage levy § 35e EnWG, fees SLP balancing levy / RLM balancing levy (formerly "standard and balancing energy levy"), fees biogas pass-on amount, allocation market area conversion, concession fee, natural gas tax = Energy tax, CO2 pricing surcharge on the energy taxes of natural gas, and the sales tax in the current amount.

Lot 4 Regional lot Ostholstein (OH)

Lot 4 Regional lot Ostholstein (OH)

54 consumption points with a reference consumption of approx. 21.7 GWh.

...

At the acceptance points registered for supply by the respective participant, reference quantities checked and approved by the participant must be indicated.

The actual consumption in the delivery period may deviate from the determined consumption data in the reference year (= reference quantities) due to use and weather conditions.

The number of consumables may also vary during the term of the contract. For further details, reference is made to the preliminary remarks on the gas supply contract in the procurement documents.

...

As of October 1, 2021, the previous market areas in Germany, Gaspool (GPL) and NetConnect Germany (NCG), were merged into a new nationwide German gas market called Trading Hub Europe (THE).

As is known in the industry, a conversion from L-gas to H-gas is currently taking place in several network areas. In some cases, this will also begin in 2024 for the acceptance points listed in the call for tenders. Specific changeover dates of the affected acceptance points will be exchanged between the participant and the supplier after appropriate knowledge of the dates.

...

Based on the judgment of the European Court of Justice (ECJ, judgment of 19.12.2018 - C-216/17 - "Antitrust and Coopservice"), the following determination is made: Regardless of the above specifications, the maximum amount of energy that can be obtained p.a. is 200% of the amount of energy specified as the reference quantity (value quantity) p.a. If this value p.a. is exceeded, the framework agreement ends for the respective delivery year.

...

The subject of the tender is the supply of natural gas as a full supply for the properties of public administrations mostly in the state of Schleswig-Holstein.

For the supply of the collection points, a natural gas is required, for which no production specifications are made by the tendering body.

...

Only the pure service for the procurement of energy and handling is put out to tender.

...

The offer prices of this tender are therefore net exclusively for services (handling) to be provided by the bidder to supply the respective acceptance point.

...

In accordance with the provisions in No. 2 of the framework agreement, the fees for energy as well as for grid use, metering point operation, billing, fees in accordance with gas security levy § 26 Energy Security Act, fees gas storage levy § 35e EnWG, fees SLP balancing levy / RLM balancing levy (formerly "standard and balancing energy levy"), fees biogas pass-on amount, allocation market area conversion, concession fee, natural gas tax = Energy tax, CO2 pricing surcharge on the energy taxes of natural gas, and the sales tax in the current amount.

The 5 Regionallos Segeberg (SE)

The 5 Regionallos Segeberg (SE)

69 consumption points with a reference consumption of approx. 17.7 GWh.

...

At the acceptance points registered for supply by the respective participant, reference quantities checked and approved by the participant must be indicated.

The actual consumption in the delivery period may deviate from the determined consumption data in the reference year (= reference quantities) due to use and weather conditions.

The number of consumables may also vary during the term of the contract. For further details, reference is made to the preliminary remarks on the gas supply contract in the procurement documents.

...

As of October 1, 2021, the previous market areas in Germany, Gaspool (GPL) and NetConnect Germany (NCG), were merged into a new nationwide German gas market called Trading Hub Europe (THE).

As is known in the industry, a conversion from L-gas to H-gas is currently taking place in several network areas. In some cases, this will also begin in 2024 for the acceptance points listed in the call for tenders. Specific changeover dates of the affected acceptance points will be exchanged between the participant and the supplier after appropriate knowledge of the dates.

...

Based on the judgment of the European Court of Justice (ECJ, judgment of 19.12.2018 - C-216/17 - "Antitrust and Coopservice"), the following determination is made: Regardless of the above specifications, the maximum amount of energy that can be obtained p.a. is 200% of the amount of energy specified as the reference quantity (value quantity) p.a. If this value p.a. is exceeded, the framework agreement ends for the respective delivery year.

...

The subject of the tender is the supply of natural gas as a full supply for the properties of public administrations mostly in the state of Schleswig-Holstein.

For the supply of the collection points, a natural gas is required, for which no production specifications are made by the tendering body.

...

Only the pure service for the procurement of energy and handling is put out to tender.

...

The offer prices of this tender are therefore net exclusively for services (handling) to be provided by the bidder to supply the respective acceptance point.

...

In accordance with the provisions in No. 2 of the framework agreement, the fees for energy as well as for grid use, metering point operation, billing, fees in accordance with gas security levy § 26 Energy Security Act, fees gas storage levy § 35e EnWG, fees SLP balancing levy / RLM balancing levy (formerly "standard and balancing energy levy"), fees biogas pass-on amount, allocation market area conversion, concession fee, natural gas tax = Energy tax, CO2 pricing surcharge on the energy taxes of natural gas, and the sales tax in the current amount.

Los 6 Regionallos Stormarn (OD)

Los 6 Regionallos Stormarn (OD)

13 collection points with a reference consumption of approx. 1.8 GWh.

...

At the acceptance points registered for supply by the respective participant, reference quantities checked and approved by the participant must be indicated.

The actual consumption in the delivery period may deviate from the determined consumption data in the reference year (= reference quantities) due to use and weather conditions.

The number of consumables may also vary during the term of the contract. For further details, reference is made to the preliminary remarks on the gas supply contract in the procurement documents.

...

As of October 1, 2021, the previous market areas in Germany, Gaspool (GPL) and NetConnect Germany (NCG), were merged into a new nationwide German gas market called Trading Hub Europe (THE).

As is known in the industry, a conversion from L-gas to H-gas is currently taking place in several network areas. In some cases, this will also begin in 2024 for the acceptance points listed in the call for tenders. Specific changeover dates of the affected acceptance points will be exchanged between the participant and the supplier after appropriate knowledge of the dates.

...

Based on the judgment of the European Court of Justice (ECJ, judgment of 19.12.2018 - C-216/17 - "Antitrust and Coopservice"), the following determination is made: Regardless of the above specifications, the maximum amount of energy that can be obtained p.a. is 200% of the amount of energy specified as the reference quantity (value quantity) p.a. If this value p.a. is exceeded, the framework agreement ends for the respective delivery year.

...

The subject of the tender is the supply of natural gas as a full supply for the properties of public administrations mostly in the state of Schleswig-Holstein.

For the supply of the collection points, a natural gas is required, for which no production specifications are made by the tendering body.

...

Only the pure service for the procurement of energy and handling is put out to tender.

...

The offer prices of this tender are therefore net exclusively for services (handling) to be provided by the bidder to supply the respective acceptance point.

...

In accordance with the provisions in No. 2 of the framework agreement, the fees for energy as well as for grid use, metering point operation, billing, fees in accordance with gas security levy § 26 Energy Security Act, fees gas storage levy § 35e EnWG, fees SLP balancing levy / RLM balancing levy (formerly "standard and balancing energy levy"), fees biogas pass-on amount, allocation market area conversion, concession fee, natural gas tax = Energy tax, CO2 pricing surcharge on the energy taxes of natural gas, and the sales tax in the current amount.

Lot 7 Regional lot Duchy of Lauenburg (RZ)

Lot 7 Regional lot Duchy of Lauenburg (RZ)

23 consumption points with a reference consumption of approx. 5.8 GWh.

...

At the acceptance points registered for supply by the respective participant, reference quantities checked and approved by the participant must be indicated.

The actual consumption in the delivery period may deviate from the determined consumption data in the reference year (= reference quantities) due to use and weather conditions.

The number of consumables may also vary during the term of the contract. For further details, reference is made to the preliminary remarks on the gas supply contract in the procurement documents.

...

As of October 1, 2021, the previous market areas in Germany, Gaspool (GPL) and NetConnect Germany (NCG), were merged into a new nationwide German gas market called Trading Hub Europe (THE).

As is known in the industry, a conversion from L-gas to H-gas is currently taking place in several network areas. In some cases, this will also begin in 2024 for the acceptance points listed in the call for tenders. Specific changeover dates of the affected acceptance points will be exchanged between the participant and the supplier after appropriate knowledge of the dates.

...

Based on the judgment of the European Court of Justice (ECJ, judgment of 19.12.2018 - C-216/17 - "Antitrust and Coopservice"), the following determination is made: Regardless of the above specifications, the maximum amount of energy that can be obtained p.a. is 200% of the amount of energy specified as the reference quantity (value quantity) p.a. If this value p.a. is exceeded, the framework agreement ends for the respective delivery year.

...

The subject of the tender is the supply of natural gas as a full supply for the properties of public administrations mostly in the state of Schleswig-Holstein.

For the supply of the collection points, a natural gas is required, for which no production specifications are made by the tendering body.

...

Only the pure service for the procurement of energy and handling is put out to tender.

...

The offer prices of this tender are therefore net exclusively for services (handling) to be provided by the bidder to supply the respective acceptance point.

...

In accordance with the provisions in No. 2 of the framework agreement, the fees for energy as well as for grid use, metering point operation, billing, fees in accordance with gas security levy § 26 Energy Security Act, fees gas storage levy § 35e EnWG, fees SLP balancing levy / RLM balancing levy (formerly "standard and balancing energy levy"), fees biogas pass-on amount, allocation market area conversion, concession fee, natural gas tax = Energy tax, CO2 pricing surcharge on the energy taxes of natural gas, and the sales tax in the current amount.

Lot 8 Regional lot Pinneberg (PI)

Lot 8 Regional lot Pinneberg (PI)

15 consumption points with a reference consumption of approx. 2.6GWh.

...

At the acceptance points registered for supply by the respective participant, reference quantities checked and approved by the participant must be indicated.

The actual consumption in the delivery period may deviate from the determined consumption data in the reference year (= reference quantities) due to use and weather conditions.

The number of consumables may also vary during the term of the contract. For further details, reference is made to the preliminary remarks on the gas supply contract in the procurement documents.

...

As of October 1, 2021, the previous market areas in Germany, Gaspool (GPL) and NetConnect Germany (NCG), were merged into a new nationwide German gas market called Trading Hub Europe (THE).

As is known in the industry, a conversion from L-gas to H-gas is currently taking place in several network areas. In some cases, this will also begin in 2024 for the acceptance points listed in the call for tenders. Specific changeover dates of the affected acceptance points will be exchanged between the participant and the supplier after appropriate knowledge of the dates.

...

Based on the judgment of the European Court of Justice (ECJ, judgment of 19.12.2018 - C-216/17 - "Antitrust and Coopservice"), the following determination is made: Regardless of the above specifications, the maximum amount of energy that can be obtained p.a. is 200% of the amount of energy specified as the reference quantity (value quantity) p.a. If this value p.a. is exceeded, the framework agreement ends for the respective delivery year.

...

The subject of the tender is the supply of natural gas as a full supply for the properties of public administrations mostly in the state of Schleswig-Holstein.

For the supply of the collection points, a natural gas is required, for which no production specifications are made by the tendering body.

...

Only the pure service for the procurement of energy and handling is put out to tender.

...

The offer prices of this tender are therefore net exclusively for services (handling) to be provided by the bidder to supply the respective acceptance point.

...

In accordance with the provisions in No. 2 of the framework agreement, the fees for energy as well as for grid use, metering point operation, billing, fees in accordance with gas security levy § 26 Energy Security Act, fees gas storage levy § 35e EnWG, fees SLP balancing levy / RLM balancing levy (formerly "standard and balancing energy levy"), fees biogas pass-on amount, allocation market area conversion, concession fee, natural gas tax = Energy tax, CO2 pricing surcharge on the energy taxes of natural gas, and the sales tax in the current amount.

Los 9 Regionallos SH

Los 9 Regionallos SH

95 consumption points with a reference consumption of approx. 7.8 GWh.

...

At the acceptance points registered for supply by the respective participant, reference quantities checked and approved by the participant must be indicated.

The actual consumption in the delivery period may deviate from the determined consumption data in the reference year (= reference quantities) due to use and weather conditions.

The number of consumables may also vary during the term of the contract. For further details, reference is made to the preliminary remarks on the gas supply contract in the procurement documents.

...

As of October 1, 2021, the previous market areas in Germany, Gaspool (GPL) and NetConnect Germany (NCG), were merged into a new nationwide German gas market called Trading Hub Europe (THE).

As is known in the industry, a conversion from L-gas to H-gas is currently taking place in several network areas. In some cases, this will also begin in 2024 for the acceptance points listed in the call for tenders. Specific changeover dates of the affected acceptance points will be exchanged between the participant and the supplier after appropriate knowledge of the dates.

...

Based on the judgment of the European Court of Justice (ECJ, judgment of 19.12.2018 - C-216/17 - "Antitrust and Coopservice"), the following determination is made: Regardless of the above specifications, the maximum amount of energy that can be obtained p.a. is 200% of the amount of energy specified as the reference quantity (value quantity) p.a. If this value p.a. is exceeded, the framework agreement ends for the respective delivery year.

...

The subject of the tender is the supply of natural gas as a full supply for the properties of public administrations mostly in the state of Schleswig-Holstein.

For the supply of the collection points, a natural gas is required, for which no production specifications are made by the tendering body.

...

Only the pure service for the procurement of energy and handling is put out to tender.

...

The offer prices of this tender are therefore net exclusively for services (handling) to be provided by the bidder to supply the respective acceptance point.

...

In accordance with the provisions in No. 2 of the framework agreement, the fees for energy as well as for grid use, metering point operation, billing, fees in accordance with gas security levy § 26 Energy Security Act, fees gas storage levy § 35e EnWG, fees SLP balancing levy / RLM balancing levy (formerly "standard and balancing energy levy"), fees biogas pass-on amount, allocation market area conversion, concession fee, natural gas tax = Energy tax, CO2 pricing surcharge on the energy taxes of natural gas, and the sales tax in the current amount.

Download full details as .pdf
The Buyer:
Land Schleswig-Holstein und Träger der öffentlichen Verwaltung, vertreten durch die Gebäudemanagement Schleswig-Holstein AöR
CPV Code(s):
09123000 - Natural gas