Sanitary, heating and refrigeration systems Extension of the Einstein Building
700m sewer line
- 600m copper drinking water installation
- Approx. 50 pumps on the heating side
- Approx. 1200m heating installation, black steel pipe
- Approx. 45 radiators
- Connection of 46 recirculating air units for heating and cooling
- Approx. 1000m cold water supply steel pipe black
- Ca. 1200 m Laborkühlwasserleitung PE100
All wood products to be used must be proven to come from sustainable forestry.