The Entreprisen consists of No-Dig refurbishment of main sewer lines with associated preliminary and TV inspection and No-Dig refurbishment of wells, as well as TV inspection and No Dig refurbishment of sewage connectors throughout the KLEAD Supply A/S supply area.
The Entreprisen consists of No-Dig refurbishment of main sewer lines with associated preliminary and TV inspection and No-Dig refurbishment of wells, as well as TV inspection and No Dig refurbishment of sewage connectors throughout the KLEAD Supply A/S supply area. The current sewage pipeline plants are predominantly communal and sewage systems, but works with wiring plants in separate rainwater systems will occur. The wires are primarily located in road areas, but placement on green spaces and on private areas may occur. The total scope of the framework agreement is, indicative, as the following main quantities (over 2+2 years)፦ Wiring refurbishment using No-Dig methods of approximately 50 km of sewage line spread over about 800 lines of conduction in varying dimensions and with associated refurbishment of approximately 1000 wells or well bottoms. - As a processing for wiring refurbishment, TV inspection and connection of approximately 4000 connectors in main wires, as well as of about 400 plugs in wells will be carried out. The scope is agreed with the builder for each partial contract. - Renovation of approximately 2200 selected sewage connectors depending on the condition of the plug detected by preliminary TV inspection. The builder determines which connectors to refurbish. - Approximately 50 point renovations; for example, as milling and part-ticking lining, or as cancelling connectors and subsequent installation of transition profile.