L486n, bypass Kevelaer-Winnekendonk, earthworks and ceiling construction works in a distance of about 1300 m and new construction of a junction area.
approx. 11,000 m3 of topsoil picking up, storing/covering or removing
approx. 53,000 m3 of soil for dam filling
Produce approx. 1,200 m of seepage line
approx. 1 shaft DN 1000 incl. 20 m pipe
approx. 28,000 m2 soil improvement by means of binders
42 pcs Installing/measuring settlement levels
produce approx. 26,000 m2 drainage layer
ca. 3,000 m2 Fahrbahndeckenaufbruch
ca. 4,400 m3 Frostschutzschicht 0/45
approx. 9,500 m2 of solidification
approx. 8,500 m2 asphalt base course made of AC 32 T S
approx. 1,500 m2 asphalt binder course made of AC 16 B S (as temporary K30)
approx. 10,200 m2 asphalt binder course made of SMA 16 B S
approx. 10,600 m2 asphalt surface course made of SMA 8 S
ca. 3.600 m Markierungsarbeiten
approx. 28 pcs of signal (mast/whip mast) supply/erect