the site will be carried out in 3 tranches:-Tranche Ferme for the following 7 lanes: rue du Commerce, rue des Vétérans, rue René Blanc and rue Paul Bert, avenue Pasteur, places Jean Deffaugt and Jean-Jacques Rousseau Are also included in the Tf: - Voluntary contribution point rue de la République - Voluntary contribution point rue de la Libération - Voluntary contribution point rue du Mont Blanc - minute stop on avenue Pasteur-Tranche Optional 1 for the following 2 lanes: rue de la Gare and avenue de la Gare and gateway to rue de Genève-Tranche Optional 2 for rue du ChablaisThe estimated start date of services is 22/01/2024. The execution time of each lot and tranche is indicated in Article 5.4 of the CCCAP
demolition / earthworks / Gc / Networks / VrdThis lot contains social clauses. The holder of this lot must reserve a minimum of 950 hours for an insertion action
floor coveringsThis lot contains social clauses. The holder of this lot must reserve a minimum of 1200 hours for an insertion action
stone coveringsstone coverings
Lighting Electrical Engineeringlighting electrical engineering
Fountainlot not affected by optional tranches. As part of this batch, variants are allowed
Access controlLot not affected by optional tranches
planting, watering and street furnitureThis lot contains social clauses. The holder of this lot must reserve a minimum of 1600 hours for an insertion action