Trockenbauarbeiten
- 2,300 m 2 Metal stud walls,
- 1,000 m 2 Installation and Shaft walls,
- 1 500 m 2 suspended plasterboard ceilings,
- 500 m 2 Acoustic ceilings on battens (glass wool, N + F),
- 150 m 2 suspended grid ceilings,
- 85 m 2 Fire protection cladding for steel components.
- 2,300 m 2 Metal stud walls,
- 1,000 m 2 Installation and Shaft walls,
- 1 500 m 2 suspended plasterboard ceilings,
- 500 m 2 Acoustic ceilings on battens (glass wool, N + F),
- 150 m 2 suspended grid ceilings,
- 85 m 2 Fire protection cladding for steel components.