The assignment consists of planned maintenance on G.O. Sars, which must be carried out within the period 1.12.2015-6.1.2016, in addition to the assembly of 3 winches in the period 15-29.4.2016. The ship will be stationed in Bergen inner harbour before this maintenance window.
See the contract and specification (Annex 1 to the competition document and Annex 1 to the contract) for further information.