The subject of this EU announcement is the fixed installations for phase II of the construction project reconstruction and renovation of the existing therapy and wellness centre in D-08648 Bad Brambach. The other works will be published in separate announcements.
4 pieces of rest room furniture, 2 pieces preparation kitchens, approx. 20m²
2 x Elevator Coverings Approx 20m² UK Elevator Cover
media walls, 11 pieces sideboards, 2 pieces riser panels,
2 pieces fire extinguisher niche panels, 1 piece Kraxenovens
wall covering, 1 piece washbasin mud applications,
1 Pcs Base Feet for Existing Shelf, 4 Pcs
Toilet partition wall systems, 2 pieces of pubic walls, approx. 35m² HPL solid core
Wall coverings, set of 4 vanities with mirror.
Particularities:
Special measures for construction work in the medicinal spring protection area (medicinal water protection zone II) are required.
Vehicles, machines and devices are to run on biofuel. hydraulic drives are,
if technically possible, switch to bio-hydraulic oil.