building cleaning
-Dry cleaning of approx. 14,000 m² floor areas
-Rubble container for the disposal of construction waste, plastic, wood, mixed waste not hazardous.
-Lifting platform/ lifting platform approx. 18 m height
Fine cleaning of:
historical multi-articulated wooden box windows (up to 5 m height inside) - 10,000 m²/ aluminium-glass façade areas - 400 m²/ aluminium façade areas, external external venetian blind systems approx. 10,000 m²/
Interior doors historic and new wooden doors approx. 2000m²/ All-glass fire doors 40 pcs. up to 5 m height/ Linoleum -10.000m² incl. skirting boards/ PVC incl. skirting board - 700 m²/ Parapet ducts - 2.500 m²/ Terrazzo surfaces - 1.000m²/ Coated floors 2.600 m²/ Tiles 1.200 m²/ Stair treads 1.000 m/ Wall coverings - 500 m²/
Special rooms - 6 complete lecture halls, laboratories, hydraulic engineering laboratories, heating and ventilation centres, planetarium, tower area up to 36 m height above ground inside and outside;
- Built-in furniture, wall-mounted wardrobe cabinets - 230 pcs, historical library with glass cabinets, pylon panels - 20 pcs and fitted kitchens - 40 running metres/ - Railings and handrails made of wood, steel and cast iron coated - approx. 700 running metres/ an elevator with 5 portals/ a lifting platform/ a historic lifting platform in the tower/ a steel spiral staircase and gallery with all-glass balustrade/ signage and fire extinguisher
Electrical installations - sockets, switches, lights, clocks, loudspeakers, Wi-Fi, cable trays
Building services installations - radiators 500 pcs., uninsulated heating pipes -8,000 m, ventilation ducts - 600 m
Sanitary facilities - 65 washbasins, 65 toilets, 25 urinals, 46 wall mirrors, partitions and accessories
Exterior -terraces, balconies and flat roof areas, entrance stairs - 1,500 m² (concrete slabs, waterproofing)
-1pc steel escape staircase exterior; Outdoor lights, terrace and balcony railings
The rooms on the ground floor, 1st and 2nd floors have room heights of up to approx. 5 m - this must be observed!