Brake shoes | Tenderlake

Brake shoes

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
21 June 2023
Closing Date:
18 July 2023
Location(s):
PL9 MAKROREGION WOJEWÓDZTWO MAZOWIECKIE (PL Poland/POLSKA)
PL911 Miasto Warszawa (PL Poland/POLSKA)
Description:
Delivery of brake inserts

The subject of the contract is the delivery of 52 000 pcs. brand new cast iron brake blocks DO-380 B with expansion joints for electric multiple units.

Delivery of brake inserts

1. The subject of the contract within the scope of task No. 1 is the supply of cast iron brake blocks DO-380 B with expansion joints in the amount of 3000 pcs.

2. The Contracting Authority shall require that:

1) the subject of the contract was in accordance with the ZN-07/PKP CARGO 8 standard,

2) brake blocks were of the highest quality, made of high phosphorus cast iron resistant to abrasion in grade P10 according to ZN-07 / PKP CARGO 4, Polish standard PN-K-88151: 2002 and UIC 832 card issued by the International Union of Railways,

3) for the subject of the contract, the Contractor had a Certificate of Admission to Service of a typical element of a rail vehicle issued by the Office of Rail Transport (formerly the Chief Railway Inspector).

3. The detailed manner and scope of the contract is specified in the Terms of Contract Specification (SWZ).

4. In all provisions of the SWZ and its annexes, in which the Contracting Authority refers to standards, European technical assessments, approvals, technical specifications and technical reference systems, in accordance with Article 101(4) of the PPL, the Contracting Authority shall allow the use of equivalent solutions. If equivalent solutions are used, the Contractor is obliged to demonstrate in writing the equivalence of the offered technical parameters in relation to the subject of the contract. The contractor shall prove in the tender, in particular by means of the evidence referred to in Articles 104-107 of the PPL, that the proposed solutions meet the requirements set out in the description of the subject of the contract to an equivalent degree.

5. Deliveries of the subject of the order will be carried out for a period of 6 months, counting from the date of conclusion of the contract.

6. The Contracting Authority requires that the Contractor grants at least a 12-month quality guarantee for the subject of the contract, counting from the date of signing the delivery document by the Contracting entity.

Delivery of brake inserts

1. The subject of the contract within the scope of task No. 2 is the supply of cast iron brake blocks DO-380 B with expansion joints in the amount of 15 000 pcs.

2. The Contracting Authority shall require that:

1) the subject of the contract was in accordance with the ZN-07/PKP CARGO 8 standard,

2) brake blocks were of the highest quality, made of high phosphorus cast iron resistant to abrasion in grade P10 according to ZN-07 / PKP CARGO 4, Polish standard PN-K-88151: 2002 and UIC 832 card issued by the International Union of Railways,

3) for the subject of the contract, the Contractor had a Certificate of Admission to Service of a typical element of a rail vehicle issued by the Office of Rail Transport (formerly the Chief Railway Inspector).

3. The detailed manner and scope of the contract is specified in the Terms of Contract Specification (SWZ).

4. In all provisions of the SWZ and its annexes, in which the Contracting Authority refers to standards, European technical assessments, approvals, technical specifications and technical reference systems, in accordance with Article 101(4) of the PPL, the Contracting Authority shall allow the use of equivalent solutions. If equivalent solutions are used, the Contractor is obliged to demonstrate in writing the equivalence of the offered technical parameters in relation to the subject of the contract. The contractor shall prove in the tender, in particular by means of the evidence referred to in Articles 104-107 of the PPL, that the proposed solutions meet the requirements set out in the description of the subject of the contract to an equivalent degree.

5. Deliveries of the subject of the order will be carried out for a period of 6 months, counting from the date of conclusion of the contract.

6. The Contracting Authority requires that the Contractor grants at least a 12-month quality guarantee for the subject of the contract, counting from the date of signing the delivery document by the Contracting entity.

Delivery of brake inserts

1. The subject of the contract within the scope of task No. 3 is the supply of cast iron brake blocks DO-380 B with expansion joints in the amount of 20 000 pcs.

2. The Contracting Authority shall require that:

1) the subject of the contract was in accordance with the ZN-07/PKP CARGO 8 standard,

2) brake blocks were of the highest quality, made of high phosphorus cast iron resistant to abrasion in grade P10 according to ZN-07 / PKP CARGO 4, Polish standard PN-K-88151: 2002 and UIC 832 card issued by the International Union of Railways,

3) for the subject of the contract, the Contractor had a Certificate of Admission to Service of a typical element of a rail vehicle issued by the Office of Rail Transport (formerly the Chief Railway Inspector).

3. The detailed manner and scope of the contract is specified in the Terms of Contract Specification (SWZ).

4. In all provisions of the SWZ and its annexes, in which the Contracting Authority refers to standards, European technical assessments, approvals, technical specifications and technical reference systems, in accordance with Article 101(4) of the PPL, the Contracting Authority shall allow the use of equivalent solutions. If equivalent solutions are used, the Contractor is obliged to demonstrate in writing the equivalence of the offered technical parameters in relation to the subject of the contract. The contractor shall prove in the tender, in particular by means of the evidence referred to in Articles 104-107 of the PPL, that the proposed solutions meet the requirements set out in the description of the subject of the contract to an equivalent degree.

5. Deliveries of the subject of the order will be carried out for a period of 6 months, counting from the date of conclusion of the contract.

6. The Contracting Authority requires that the Contractor grants at least a 12-month quality guarantee for the subject of the contract, counting from the date of signing the delivery document by the Contracting entity.

Delivery of brake inserts

1. The subject of the contract within the scope of task No. 4 is the supply of cast iron brake blocks DO-380 B with expansion joints in the amount of 14 000 pcs.

2. The Contracting Authority shall require that:

1) the subject of the contract was in accordance with the ZN-07/PKP CARGO 8 standard,

2) brake blocks were of the highest quality, made of high phosphorus cast iron resistant to abrasion in grade P10 according to ZN-07 / PKP CARGO 4, Polish standard PN-K-88151: 2002 and UIC 832 card issued by the International Union of Railways,

3) for the subject of the contract, the Contractor had a Certificate of Admission to Service of a typical element of a rail vehicle issued by the Office of Rail Transport (formerly the Chief Railway Inspector).

3. The detailed manner and scope of the contract is specified in the Terms of Contract Specification (SWZ).

4. In all provisions of the SWZ and its annexes, in which the Contracting Authority refers to standards, European technical assessments, approvals, technical specifications and technical reference systems, in accordance with Article 101(4) of the PPL, the Contracting Authority shall allow the use of equivalent solutions. If equivalent solutions are used, the Contractor is obliged to demonstrate in writing the equivalence of the offered technical parameters in relation to the subject of the contract. The contractor shall prove in the tender, in particular by means of the evidence referred to in Articles 104-107 of the PPL, that the proposed solutions meet the requirements set out in the description of the subject of the contract to an equivalent degree.

5. Deliveries of the subject of the order will be carried out for a period of 6 months, counting from the date of conclusion of the contract.

6. The Contracting Authority requires that the Contractor grants at least a 12-month quality guarantee for the subject of the contract, counting from the date of signing the delivery document by the Contracting entity.

Download full details as .pdf
The Buyer:
"Koleje Mazowieckie-KM" sp. z o. o.
CPV Code(s):
34322500 - Brake shoes