New construction of MRV Schwäbisch Hall
Automationseinrichtung
- Complete control of 4 ventilation systems with heat recovery, heating and cooling
- Control of approx. 450 fire dampers 230V
- Individual room control of the entire FBH of approx. 450 rooms with 870 circuits
- Individual room control of the entire CCT of approx. 130 rooms with 130 circuits
- Individual room control of the circulating air chillers (approx. 25 units and 9 rooms)
- Control of approx. 15 mixed heating circuits
- Control of approx. 5 mixed cooling circuits
- Control and control of a chiller via ModBUs
- Connection of approx. 20 heat and water meters via Modbus
- Connection of messages of the pressure controls heating and cooling (approx. 4 systems with 5 messages each)
- Connection of messages from the primary district heating transfer station
- Connection of operating and fault messages from all sanitary facilities such as hygienic flushes, grease traps, pressure boosting systems (in total approx. 20 systems with 3-4 data points each)
- All field devices are to be supplied by the I&C company (installation on site)
- Recording of messages of the EDP air conditioning (approx. 10 systems of 3 messages each)
- Central heating and cooling interlock
- Approx. 12 control cabinets divided into 6 information focal points
- Central master computer for integration and visualization of all systems
- Separate fault message display for the gate