It is planned to procure materials for laying a drinking water pipe made of PE 100.
1st stage of construction a DN 300 MDP 16 remote water pipe from the Gleina delivery station (AGS)
up to the elevated tank (HB) Mücheln. The overall length is approximately 7.15 km.
The project touches the districts of Burgenlandkreis and Saalekreis in the state of Saxony-Anhalt.
Piping material PE and steelDelivery of various types of pipe material PE and steel, electric welding sleeves,
Fittings, PE cable liner pipe
Delivery period: from 04/2022
Pipeline fittings and structuresDelivery of gate valves, pipe fittings and accessories
Delivery period: from 04/2022
Cables - Fiber-optic cables (fiber optic cables) including accessoriesDelivery of fiber optic cables including accessories
Delivery period: from 04/2022