The OBS Marklohe is comprehensively renovated and expanded.
For this purpose, the existing school building of the OBS Marklohe will be built except for the load-bearing
Reinforced concrete skeleton construction dismantled. The interior layout is restructured to accommodate the new
Space program and to meet the current space requirements. The exterior façade is constructed in a timber panel construction.
Essentially, these are:
6 pieces of hot air turbine 150 kW
100 m air hose DN400
Fuel Supply Coordination
Mobile Warmluftturbinen
for the heating of the secondary school in Marklohe.
Depending on the weather conditions, presumably from:
1. November 2023 bis 30. April 2024
The following hot air turbines are planned:
UG = 1x Warmluftturbine 150 kW
EG = 2x hot air turbine 150 kW
OG 1 = 2x Warm air turbine 150 kW
OG 2 = 1x Warm air turbine 150 kW
After consultation with the construction management, the installation areas are
and define the number of devices. The number of devices
may decrease.