FL 29 High Current
The 29 - Starkstromanlage
Construction of the high-voltage electrical installation of a school and sports hall.
Installation of approx.:
-1 converter counter cabinet and 13 distributors
-1.4 km cable duct/trough/conductor/pipe
-1.5 km slots
-20.7 km Cable/wires
-730 sockets/buttons/switches
-444 lights
-Central emergency lighting system with 1 sub-control panel and 119 luminaires
-Programming of Dali control
Maintenance is taken into account in the quotation valuation for a term of 4 years without the application of a present value factor. An unspecified maintenance price will result in the exclusion of the offer.
For more contract deadlines, see procurement documents
"+++ The following documents are required at the separate request of the
Allocation of unit prices
Form 223; - Original calculation, content of the
Original calculation: This is at least according to the content according to
Form 223 - Breakdown of unit prices of ALL
create positions, i.e.: LV position; Abbreviation;
Quantity; Unit of quantity; time approach; Partial costs incl. additions
in euro per unit of measure (wages, fabrics, equipment, other);
offered unit price (sum of wages, fabrics, equipment,
Miscellaneous). +++