The RNLAF has a requirement for the repair, overhaul and inspection of the F-16 Constant Speed Drive (CSD) for the period 2017 — 2021 with an annual option to extend until 2023.
Get our periodical newsletter about how sell more to the public sector and how to make the most of Tenderlake.