The subject of the order is the delivery, assembly, connection to the power grid and the commissioning of two two-output free-charging stations of direct current electric buses, with a power output adjustable in the range of 60-120 kW on the territory of the depot MZK Sp. z o. o. o., mobile single-line station free charging of direct current electric buses with a power of 20 kW, delivery of the system for management and monitoring of stations and charging points, production of power connections and foundation sites for three existing mobile charging stations. In addition, within the subject of the order, the Contractor is tasked with increasing power by 200 kW for loop charging stations:
- Zielona Góra, Wrocławska Street, stop no. 428;
- Zielona Góra, Tadeusz Zawadzki Street “Zośki”, stop no. 183;
4.1. The subject of the contract is delivery, installation, connection to the power grid and commissioning of two dual-output free charging stations of direct current electric buses, with an adjustable power output in the range of 60-120 kW in the territory of the MZK Sp. z o. o. Depot, a mobile single-aisle station free charging of direct current electric buses, with a power of 20 kW, delivery of a system for management and monitoring of stations and charging points, making power connections and foundation sites for three existing mobile charging stations. In addition, within the subject of the contract, the Contractor is tasked to increase the power by 200 kW for charging stations on loops:
- Zielona Góra, Wrocławska Street, stop no. 428;
- Zielona Góra, Tadeusz Zawadzki Street “Zośki”, stop no. 183;
The Contractor shall make 3 information and commemorative boards and mark the infrastructure of the charging station in accordance with the guidelines for information and promotion (Section 8 Promotion and information on the Project III part of the SWZ-OPZ).
The subject of the contract is also the supply of 2 (in words: two) pieces of dual-output free charging stations of direct current electric buses, with an output power regulated in the range of 40-80 kW on the territory of the MZK Sp. z o. o. depot within the scope of the option, within the meaning of Article 441 of the PZP in case of commissioning by the Ordering Party reserved the right of options in accordance with the provisions of point 4.7 in the amount of up to 20% of the basic order.