039 Drywall work
1. Drywall ceilings without fire protection requirements,
smooth and with perforation approx. 145 m2
Ceiling edge frieze, smooth approx. 450 m
2. Drywall ceilings with fire protection requirement F30 and F90
approx. 1400 m2
3. Installation of threaded rods M6, l = approx. 25 cm in ceilings approx. 1850 pieces
4. Drywall and facing shells approx. 920 m2