The works consist of the overall development and restructuring of the occupied site, from the university center of Tarn-et-Garonne, to Montauban, comprising:
- a building to be built in R + 1,
- 2 buildings to rehabilitate: education pavilion (R + 1), knowledge pavilion (R + 2),
- 3 pavilions to refurbish: university restaurant, media library (R + 1), computer pavilion (R + 1),
- outdoor facilities: roads, parking, green areas.
Structural work demolition frame roofingMasonry demolition work, interior partitions with asbestos abatement. Structural work for heavy restructuring of existing buildings of approximately 5,439.00 m2 and new construction in R + 1 concrete frame, concrete floors on approximately 2,530.00 m2, temporary renovation of roof tiles
LocksmithLocksmithing works (railings, grilles, various frames, etc ....) in existing buildings (heavy restructuring) and new building, with a total floor area of approximately
7,969.00 m2. Supply and installation of an external emergency metal staircase in R + 2.
Soils hard earthenware soft floorsTiling, earthenware and soft floors in existing buildings (heavy renovation) and new building, with an overall floor area of approximately 7,969.00 m2.
PaintingsPainting and wall covering work in existing buildings (heavy renovation) and new building with an overall floor area of approximately 7,969.00 m2
ElevatorEstablishment of an elevator serving 3 levels in an existing building (masonry sheath at the expense of the structural work package)
vrdWorks of networks (dry and wet) exterior, external facilities (parking ways, pedestrian paths, green spaces, etc ...), development of a forecourt, realization of a structure of regulation of rainwater (concrete work) surface of the plot about 20 450,00 m2
Kitchen equipmentRestructuring of the diving of the existing university restaurant
SealingSealing work on roof terrace support concrete floor for new building R + 1 with a floor area of about 2,530.00 m2 Spot sealing of roof support tray steel
Façade treatmentFacade cladding work including external insulation brick cladding (molded concrete type) smooth metal cladding for new building floor area approx 2,530.00 m2
Aluminum exterior joinerySupply and installation of exterior aluminum joinery and exterior BSO in existing buildings (heavy restructuring) and new buildings. Overall floor area approximately 7,969.00 m2
Heating ventilationHeating works ventilation in existing buildings (heavy restructuring) and new building, with an overall floor area of approximately 7,969.00 m2. Existing central boiler room, substations, networks and furnaces to be treated. Implementation of a CTA in new building. VMC works
PlumbingSanitary plumbing works in existing buildings (heavy restructuring, total refurbishment) and new building, with an overall floor area of approximately 7,969.00 m2. Public sanitary facilities, water points in technical classrooms and offices
Electricity weak current strong currentsWork of strong / weak currents in existing buildings (heavy restructuring, total renovation) and new building, with an overall floor area of approximately 7,969.00 m2. Computer link between buildings
Exterior woodwork and interior woodworkInterior woodworking in existing buildings (heavy renovation) and new building, with an overall floor area of approximately 7,969.00 m2. Supply and installation of exterior wood joinery in building XIX, with a floor area of approximately 3,000.00 m2
Plastering false ceiling insulationDuplication, partitioning and false ceilings in existing buildings (heavy renovation) and new building with an overall floor area of approximately 7,969.00 m2