LNG run tank with Minimum scope of supply:
— Tank with safety group and pressure regulation for stand still, measurement devices for pressure, temperature and Level,
— Design and engineering for construction, design review,
— Procurement of material, fabrication and Integration,
— Quality assurance and control,
— Tests, workshop acceptance, authority approvals,
— As built documentation,
— Transport, erection.
In the framework of the P8.3 project, following equipment will be tendered:
LNG run tank with following key technical data:
— Volume: 6-7m
— Arrangement: vertical,
— Fluid: LNG,
— Max. operation pressure: 16 bar,
— Operation temperature: 114 K,
— Material inner tank and piping: 1.4404,
— Compatible for first chill down with LN2 (70K),
— Design compatible down to 21K (no certification required),
— Inner tank: vacuum resistance,
— Insulation: Perlite-vacuum,
— Boil off rate: <0,4 %/day at filling level 95 %,
— Operation: External pressurization with 200g/s GH2,
— Output: max. 7 kg/s LNG,
— Cleanliness requirements in accordance ISO 23208,
— Design in accordance to PED,
Option: Multilayer vacuum Isolation;
Minimum scope of supply:
— Tank with safety group and pressure regulation for stand still, measurement devices for pressure, temperature and level,
— Design and engineering for construction, design Review,
— Procurement of material, fabrication and integration,
— Quality assurance and control,
— Tests, workshop acceptance, authority approvals,
— As built documentation,
— Transport, erection.
Option: max. 6 month storage at supplier