Foul-water piping construction work | Tenderlake

Foul-water piping construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
25 February 2022
Closing Date:
01 April 2022
Location(s):
BE23 Prov. Oost-Vlaanderen (BE Belgium/BELGIQUE-BELGIË)
Description:
Project 22.689/1 - Sint-Niklaas/Sinaai, connection Zwaanaarde

Project 22.689/1 - Sint-Niklaas/Sinaai, connection Zwaanaarde

With connection of Keizerstraat, Oude Keizerstraat, Leebrugstraat and parts of Leestraat, Heirstraat, Wapenaarteindestraat and Weimanstraat.

The agreement to be executed aims to:

Plot 1: The implementation of road and sewerage works Zwaanaarde, Keizerstraat, Oude Keizerstraat, Leebrugstraat and parts of Leestraat, Heirstraat, Wapenaarteindestraat and Weimanstraat.

Plot 2: decoupling works on private domain in the streets listed above

Plot 1 includes in particular:

• preparatory burglary works of existing pavements and sewerage with the connections.

• construction of semi-separate sewerage with house connections and street swirling.

❖ tubes < di 400:4,681 m

❖ tubes di 400:149 m

❖ tubes di 500:454 m

❖ tubes di 600:2,535 m

❖ tubes di 700:298 m

❖ tubes di 800:69 m

• installation of prefabricated rectangular tubes

❖ tubes 3000 x 1000 mm: 11 m

❖ tubes 3500 x 1250 mm: 14 m

❖ tubes 3750 x 1250 mm: 11 m

• installation of pressure sewage HDPE PN16

❖ Tubes du 63mm: 78 m

❖ Tubes du 75mm: 446 m

❖ Pump units: 6 pieces

❖ Power and communication cables: 537 m

❖ Construction by means of directional drilling: for 3 units, each order size 25m

• installation of press pipe in HDPE PN16

❖ Tubes du 125:1,718 m

• pump station construction:

❖ PS 1 - Swan Earth

❖ PS 2 — Hellestraat

❖ PS 3 — Oude Keizerstraat

❖ PS 4 — Weimanstraat

❖ PS 5 — Leebrugstraat

❖ Delivery station PS 6 - Leebrugstraat

• construction of overflows — internal surrender

• Cleaning pipes and drainage of sludge: 370m

• Construction of roadway with pavement in KWS (3 layers) on the foundation of crushed stone and underfoundation type II

• Construction of school environment in concrete pavers on draining concrete foundation and under-foundation type II

• Reconstruction of roadway (Leestraat) in boulders on crushed stone foundation and type II underfoundation.

• Construction of roadway (Hellestraat) in boulders on crushed stone foundation and type II underfoundation.

• Construction of roadway in concrete on crushed stone foundation and type II underfoundation.

• Construction of roadway in washed out dented concrete on crushed stone foundation and type II underfoundation.

• Construction of farewell strips in printed concrete on crushed stone foundation and type II underfoundation.

• Construction of bicycle paths in concrete on crushed stone foundation.

• Construction of bike paths in the mass of colored red concrete (all granulates are color -supporting)

crushed stone foundation.

• Construction of roadside strips in grass concrete tiles on crushed stone foundation and type II underfoundation

• Construction of parking strips in boulders in modified mortar on skimpy concrete foundation and type II underfoundation

• Construction of speed bumps in precast concrete on skimpy concrete foundation and type II underfoundation

• construction of gutters, side strips and curbstones.

• Corten steel drilling (school environment) on and anchored in steel fibre reinforced concrete foundation on type II underfoundation

• Construction of road sections with water-permeable function:

❖ Construction of roadway with pavement in KWS (3 layers - Heirstraat) on the foundation of crushed stone and water-permeable underfoundation type II

❖ Construction of roadway in boulders (Wapenaarteinthe street) on water-permeable foundation of crushed stone and water-permeable underfoundation type II.

❖ Construction of strips in dented concrete along the roadway (Heirstraat and Wapenaarteindestraat) on water-permeable foundation of crushed stone and water-permeable underfoundation type II.

❖ Construction of grass concrete tiles on water-permeable foundation of crushed stone and water-permeable underfoundation type II.

• realization of the drainage canals

• construction of green plantings and street furniture.

• construction of pavement sawn porphyry pebbles (platins) in modified mortar on the foundation of skimpy concrete.

...

Project 22.689/1 - Sint-Niklaas/Sinaai, connection Zwaanaarde

With connection of Keizerstraat, Oude Keizerstraat, Leebrugstraat and parts of Leestraat, Heirstraat, Wapenaarteindestraat and Weimanstraat.

The agreement to be executed aims to:

Plot 1: The implementation of road and sewerage works Zwaanaarde, Keizerstraat, Oude Keizerstraat, Leebrugstraat and parts of Leestraat, Heirstraat, Wapenaarteindestraat and Weimanstraat.

Plot 2: decoupling works on private domain in the streets listed above

Plot 1 includes in particular:

• preparatory burglary works of existing pavements and sewerage with the connections.

• construction of semi-separate sewerage with house connections and street swirling.

❖ tubes < di 400:4,681 m

❖ tubes di 400:149 m

❖ tubes di 500:454 m

❖ tubes di 600:2,535 m

❖ tubes di 700:298 m

❖ tubes di 800:69 m

• installation of prefabricated rectangular tubes

❖ tubes 3000 x 1000 mm: 11 m

❖ tubes 3500 x 1250 mm: 14 m

❖ tubes 3750 x 1250 mm: 11 m

• installation of pressure sewage HDPE PN16

❖ Tubes du 63mm: 78 m

❖ Tubes du 75mm: 446 m

❖ Pump units: 6 pieces

❖ Power and communication cables: 537 m

❖ Construction by means of directional drilling: for 3 units, each order size 25m

• installation of press pipe in HDPE PN16

❖ Tubes du 125:1,718 m

• pump station construction:

❖ PS 1 - Swan Earth

❖ PS 2 — Hellestraat

❖ PS 3 — Oude Keizerstraat

❖ PS 4 — Weimanstraat

❖ PS 5 — Leebrugstraat

❖ Delivery station PS 6 - Leebrugstraat

• construction of overflows — internal surrender

• Cleaning pipes and drainage of sludge: 370m

• Construction of roadway with pavement in KWS (3 layers) on the foundation of crushed stone and underfoundation type II

• Construction of school environment in concrete pavers on draining concrete foundation and under-foundation type II

• Reconstruction of roadway (Leestraat) in boulders on crushed stone foundation and type II underfoundation.

• Construction of roadway (Hellestraat) in boulders on crushed stone foundation and type II underfoundation.

• Construction of roadway in concrete on crushed stone foundation and type II underfoundation.

• Construction of roadway in washed out dented concrete on crushed stone foundation and type II underfoundation.

• Construction of farewell strips in printed concrete on crushed stone foundation and type II underfoundation.

• Construction of bicycle paths in concrete on crushed stone foundation.

• Construction of bike paths in the mass of colored red concrete (all granulates are color -supporting)

crushed stone foundation.

• Construction of roadside strips in grass concrete tiles on crushed stone foundation and type II underfoundation

• Construction of parking strips in boulders in modified mortar on skimpy concrete foundation and type II underfoundation

• Construction of speed bumps in precast concrete on skimpy concrete foundation and type II underfoundation

• construction of gutters, side strips and curbstones.

• Corten steel drilling (school environment) on and anchored in steel fibre reinforced concrete foundation on type II underfoundation

• Construction of road sections with water-permeable function:

❖ Construction of roadway with pavement in KWS (3 layers - Heirstraat) on the foundation of crushed stone and water-permeable underfoundation type II

❖ Construction of roadway in boulders (Wapenaarteinthe street) on water-permeable foundation of crushed stone and water-permeable underfoundation type II.

❖ Construction of strips in dented concrete along the roadway (Heirstraat and Wapenaarteindestraat) on water-permeable foundation of crushed stone and water-permeable underfoundation type II.

❖ Construction of grass concrete tiles on water-permeable foundation of crushed stone and water-permeable underfoundation type II.

• realization of the drainage canals

• construction of green plantings and street furniture.

• construction of pavement sawn porphyry pebbles (platins) in modified mortar on the foundation of skimpy concrete.

...

Download full details as .pdf
The Buyer:
Aquafin NV - Directie Infrastructuur
CPV Code(s):
45232411 - Foul-water piping construction work