The description of the works and their technical specifications are indicated in the specifications of the special technical clauses.
This consultation concerns only lots 1, 8 and 9 which were opened to tender.
Lots 2 to 7 and 10 to 11 are the subject of another consultation (small lots).
The overall duration of the contracts shall be fixed between the date of receipt of the contract notification and the end of the period of the guarantee of perfect completion.
The period for the preparation period shall run from the date of the start-up service order for a period of two months.
The period for the execution of the works runs from the start-up service order for a total period of 18 months set out in the provisional execution schedule, including foreseeable bad weather.
The contract will be terminated at the end of the guarantee period of full completion of the contract.
As an indication, the start of the preparation period is envisaged in April 2024
Extensive shellThe description of the lots can be found in the CCTP:
demolition - large work
frame
Covering, Waterproofing
Facades, cladding
Exterior wood furnishings
Metalwork, locksmith
Tiles - earthenware
coated stainless steel basins
Water Treatment-Plumbing-Sanitary-HVAC-WATER GAMESThe description of the lots can be found in the CCTP:
- Water Treatment Plumbing
-Health
- Water treatment
-heating
- Ventilation
- Water games
CFO/CFA Electricity - pHOTOVOLTAICThe description of the lots can be found in the CCTP:
- Cfo/CFA electricity
-Photovoltaic