4-storey extension to existing hospital as main measure
and conversion measures in the existing ground floor up to 3rd floor -
as well as preliminary measures with construction of external stairs and emergency exits
and interim relocation of the existing main entrance
960 m² substrate pretreatment and bitumen primer
960 m² vapour barrier + emergency sealing bitumen welding membrane G200 S4 AL
140 m Attikaausbildung
880 m² pressure-resistant mineral wool slope insulation d=i. M. 220mm
960 m² roof waterproofing bitumen welding membrane 2-ply
315 m attic connections 2-layer
150 m wall connections 2-layer
18 pcs. flat roof and emergency drains as main emergency combination (pipe-in-pipe)
185 m steel downpipes incl. vents as main emergency combination (pipe-in-pipe)
18 pcs. penetrations for strand vents
830 m² fibre fleece as a protective layer under gravel
830 m² Kiesschüttung d=min.6cm
75 m² pavement concrete slabs 40x40cm
1 SHEV light dome above staircase 120x120cm
21 anchor points as fall protection
140 m Sicherungsseil
approx. 220 m attic sheet metal covers of different unwindings
70 m² extensive green roof for atrium
225 m² Sealing floor technical center 4th floor Bitumen welding membrane G200 S4 AL
1100 m² Sealing soil moisture EG bitumen welding membrane G200 S4 AL