Carpentry installation work

Contract Value:
EUR 65K - 65K
Notice Type:
Contract Notice
Published Date:
14 September 2020
Closing Date:
12 October 2020
Location(s):
DE237 Neustadt a. d. Waldnaab (DE Germany/DEUTSCHLAND)
Description:
Gymnasium Neustadt an der Waldnaab - general renovation of carpentry work, mullion-transom facades, interior door elements

Gymnasium Neustadt an der Waldnaab - general renovation

Carpentry work, mullion and transom facades, interior door elements;

Manufacture, delivery and installation of mullion and transom facades in the interior for the library room as mullion and transom facades in wood. The elements are to be implemented partly with fixed glazing and partly with interior doors with glass cut-outs. Execution in the course of the 2nd construction phase for the general renovation of the Neustadt an der Waldnaab grammar school.

1. "General description BA1 AND BA2":

The Neustadt an der Waldnaab high school, a state high school for boys and girls, was founded in 1972 and completed in 1977. The school is currently attended by around 600 pupils who are taught by 64 teachers. The building, executed in concrete post construction, was adapted to the existing slope topography and constructed as a split-level structure over a total of 6 levels (further description follows under the point: “Structure of the building”).

GFA: 11,090.00 m 2

NGF: 9,256.00 m 2

In order to meet the demands of a modern high school, the school in Neustadt an der Waldnaab should be completely renovated. On the one hand, this serves to transform the existing building into a modern learning house, on the other hand, the new energetic and safety-related requirements (fire protection, building physics, etc.) for a contemporary, environmentally conscious building must be met.

2. "Execution information":

The renovation of the entire system is planned in 2 construction phases. The first construction phase has already been completed. In the second construction phase, around a third of the main building will be completely renovated and revised inside and out. During this time, school operations will take place in the part of the building that has already been renovated, as well as in other areas in the gymnasium. This specification describes the work relating to the 2nd construction phase.

Working hours or restrictions:

A distinction is made between 3 times for the execution of the work and the associated noise pollution of the students with the following restrictions: Abitur exams

Restriction: No noise at and in the building. No drilling and machine-guided demolition work on the concrete structure or solid components, no excavator operation on the building, no compaction (vibrating plates, etc.), no use of the rubble chutes during the Abitur period.

Possible examination times in general Restriction: No drilling or machine-guided demolition work on the concrete structure. Avoidance of very noisy work

Period: Monday to Friday with the exception of school holidays (see next point)

8.00 a.m. to 11.30 a.m. (homework time)

School holidays

No restrictions. Particularly intensive use of these time periods by appropriate staff and equipment increase. Noise-intensive breakthroughs and demolitions of the concrete structures (with the exception of component 1) should take place during these periods if possible.

Holiday times 2020:

- Christmas: 23.12.20-9.1.21.

Holiday times 2021:

- Winter: 15.2.21-19.2.21;

- Easter: 29.3.21-10.4.21;

- Pentecost: 25.5.21-4.6.21;

- Summer: 30.7.21-19.9.21;

- Autumn: 2.11.21-5.11.21;

- Christmas: 24.12.21-8.1.22.

Since the work takes place during normal operation and it is a school building, special attention should be paid to noise and damage! In the course of the general renovation, part of the building construction and surfaces remain unaffected by the construction work or have already been completed. Areas adjacent to the respective service must be kept free of damage and accordingly protected from damage during the course of the work! Appropriate protective measures must be included in the unit prices.

3. "Scope of services - description of the work":

The specification describes all the work required for the interim subdivision of the two construction phases using drywall.

site equipment

Manufacture, delivery and installation of the post-and-beam facade as a wood-wood construction

The individual service areas of the scope of services are listed under General and Additional Contractual Conditions for the course, and in the individual items.

4. "Execution period":

Measurement: 21.6.21-25.6.21

Work / release planning: 28.6.21-9.7.21

Production / assembly: 12.7.21-24.9.21

The deadlines are contractual deadlines. School operations can only take place in a restricted and very cramped manner during the conversion period. For this reason, the measure must be completed on time. Funding is also tied to this schedule. Failure to meet the deadlines will result in the loss of the deadline and will be charged to the party responsible.

Download full details as .pdf
The Buyer:
Landkreis Neustadt an der Waldnaab
CPV Code(s):
45420000 - Joinery and carpentry installation work
45421150 - Non-metal joinery installation work
45422000 - Carpentry installation work