Refuse-incineration plant construction work | Tenderlake

Refuse-incineration plant construction work

Contract Value:
EUR 17M - 17M
Notice Type:
Contract Notice
Published Date:
28 June 2023
Closing Date:
17 October 2023
Location(s):
ITI18 Arezzo (IT Italy/ITALIA)
Description:
CONTRACT FOR THE EXECUTIVE DESIGN AND CONSTRUCTION OF THE WASTE TREATMENT SYSTEM WITH STEAM PRODUCTION OF THE L75 ENERGY RECOVERY LINE OF THE SAN ZENO PLANT, AREZZO (AR)

CONTRACT FOR THE EXECUTIVE DESIGN AND CONSTRUCTION OF THE WASTE TREATMENT SYSTEM WITH STEAM PRODUCTION OF THE L75 ENERGY RECOVERY LINE OF THE SAN ZENO PLANT, AREZZO (AR)

CONTRACT FOR THE EXECUTIVE DESIGN AND CONSTRUCTION OF THE WASTE TREATMENT SYSTEM WITH STEAM PRODUCTION OF THE L75 ENERGY RECOVERY LINE OF THE SAN ZENO PLANT, AREZZO (AR)

Download full details as .pdf
The Buyer:
AISA IMPIANTI S.p.A.
CPV Code(s):
45252300 - Refuse-incineration plant construction work
71242000 - Project and design preparation, estimation of costs